I hope that too, Chris.
It was hard to get good pictures, but as of June 3, 2016, the foundation is done, and this is ready to rise!!!
Uploading…
Great!
We can’t wait to see its first floors to appear!
And these pictures are not so bad at all, robert!
Good to see workers and site managers wear their PPE. You’d be surprised at the disregard for safety regulations, even amongst supervisors.
Very interesting!
Like the model and drawings of the 125 Greenwich Street!
Very nice finding, Thomas!
I just counted and we got a 68 story building!
Yeah, probably.
And it looks better than before. ^^
This looks good. I’m eager to learn how talk it will be.
I just watched the video. The model looks good, but it’s a shame that they didn’t show the crown.
I wonder who created the models that were displayed at Astor Place?
This model is very “shvovanistic” but I meant give it a standing "shvovation
The model @ Astor was commissioned by Shvo & Bizzi.
The model in that video does look pretty good.
So… the big mystery here is what’s it gonna be?
900 ft or 1,050 plus ft?
Looks so much better w/o that needle on top
That’s, VG. Based upon that model, I assume that it will be around 950’.
That’s what I’m thinking too. I’d say somewhere betw 950’-1,000’.
It looks l I keep when they are finished pouring the walls, they will start installing rebar and then soon concrete. I think this structure will be built in all concrete, like what the same developer did with 432 Park
According to workers at the site, the concrete floor and rebar have been installed, and this is ready to rise. This seems to be correct, as per the photo above.
I think 1,000 feet is the best height for this location. The previous height was way too tall for the location.