looks like demo is starting
11 Likes
Can’t wait
1 Like
The small 1 level retail on the corner from Tec’s pics^ are now demolished. Most other buildings on the block are in the process of demo as well.
7 Likes
7 Likes
Looks like all buildings are now gone. (Except the older ones which are staying as.part of the new development).
11 Likes
12 Likes
3 Likes
A lot going on. The sidewalk along Flatbush is closed and one lane is being converted into a covered construction walkway.
20 Likes
It’s about time we see some activity here
3 Likes
Alloy Development lands $240M to start construction on 80 Flatbush
4 Likes
11 Likes
Great perspective!
3 Likes