NEW YORK | 270 Park Ave | 1,389 FT | 70 FLOORS

19 Likes

Very nice photo, JC!

1 Like

the building is gonna be so tall that it is taller than the Chrysler building.

1 Like

Uhh yeah. Indeed it will be.

6 Likes

It will be taller than the Astrodome too.

9 Likes

9 Likes

Bear Stearns building looks on in distain - :face_with_monocle:

3 Likes







12 Likes

18 Likes

Looks like the cranes have risen again. The cabins are completely out of frame.

10 Likes

New steel has been added now that the cranes have jumped, the last vertical construction we will see from this vantage point. The midpoint of these columns is where the diamond inverts back the other direction, so the midpoint of this tier has now been reached, the building is now around ~635’ (+/- 5’) tall.

Concrete works are a floor below the first setback, and fireproofing 2 levels below that. As far as vertical construction for the rest of the year goes, after these 2 floors, there is a taller transition floor and then the next lesser mechanical floor of this tier, things will slow down again once this is reached. Overall, the New Year should start with the building being nearly half it’s completed height if the mechanical floor columns are erected before then/after.

9 Likes

When do you think it will top out?

Later next year

2 Likes

Yes, I can definitely see it topping out later next year, earliest in Q3. I believe once this tier is done, 2 of the cranes will be dismantled. So that will inevitably slow things down, but the speed should be the same as once that point is reached, the floor area will already be half of the lower tier, so the work β€œpace” is still technically the same.

6 Likes

Thanks




20 Likes

15 Likes

I spy!


Credit: GaryHershorn

19 Likes

https://www.instagram.com/p/CmAUFSDp12F/?igshid=N2ZiY2E3YmU=

https://www.instagram.com/p/ClqQy4Bok2a/?igshid=N2ZiY2E3YmU=

5 Likes



Peter Moy on Flickr

10 Likes