They got a good deal on this property.
Out with the old and in with the new!! Ok, maybe not. Should we start a thread of majorly stalled NY eyesores instead?
Earlier today I noticed there were workers on the steel platform under the cantilevered section, including one climbing a ladder connecting the platform to a hole on the bottom of the lowest cantilevered floor.
Listen Joe, we need you to climb up on your ladder, reach over to the drain, and pull the plug on this project.
The City of New York needs a Department of Cantilever Aesthetics Control.

Probably a sample for inspection.
It 100% is a reflection, though the render made it look better. Someone should just redesign this like Xadia was, but just make the redesign actually worth it.
Fake news.
Construction has not resumed.
This remains stalled.
It actually has surprisingly resumed construction, 7 floors have been added since the end of March, 6 of them in the last month alone.
Itβs still somewhat relatively slow, but it is amazingly back under construction, though with the same bad old design.
I pass by the site every day, and construction has indeed resumed
My bad. Maybe I got it confused with the Xadia or had a brain fart or something.
It seems like the top has potentially changed sinced it doesnt look like that in the render.
This thing is so ugly.




















