MIAMI | 340 West Flagler St (Flagler On The River) | 321 FT | 32 FLOORS | Com

Construction will finish in 2015.
It is topped off, interior work is
occurring.

Rendering:


Current Status:

References:

  1. http://www.flaglerontheriver.com/
  2. http://www.lrstructural.com/wp-content/uploads/2014/04/FlaglerRiver-2014-03-28.jpg

Flagler on the river is complete,

Photos can be found here: Flagler On The River Is Now Open — Golden Dusk Photography
(Due to the photo being copyrighted, I can’t post it here). I will email for the future Miami projects for permission as GoldenDusk is an excellent source for Miami photos. Would highly recommend to check it out.

This is one of many that will finish by the end of 2014 or Q2014. This tower actually finished before its 2015 targeted date, which is great.

1 Like