WHITE PLAINS | Hamilton Green | 2x 280 FT + 2x 150 FT | 2x 28 + 2x 15 FLOORS

4 Likes

I thought there were meant to be 4 buildings. Why are they only showing 2 here?

Marketing the two for leasing. The next 2 are already being built.

1 Like

Photos by Seth Harrison/The Journal News

9 Likes

the plaza is open. You can get a good vantage point on the second phase construction. There’s a nice breezeway between the first two buildings leading out to the cross street. Also, the cladding seems much darker now. Maybe some blinds on the inside. But it’s almost black.

12 Likes
2 Likes

When I saw this a couple weeks ago, they seemed to be building additional buildings where the park is located in the renderings? Is it meant to be a park or additional buildings going there?





A crane has been put up so we probably will be seeing an additional building or two.

6 Likes

The YIMBY article is erroneous. These renderings have been out for awhile (i think they were previously posted here!) and they depict the first phase. Both 25 Cottage and 5 Cottage were constructed simultaneously, and the next phase has another pair of buildings.

November 2024

3 Likes

what else is new?

1 Like

The next phase of this project is up to street level. A crane is also operational. Screenshot via ASF Construction

8 Likes

14 Likes
4 Likes

The fourth building is starting to rise. Seems like little is known about the two buildings they are currently constructing. I wonder if they will ever release renderings of what the whole site will look like.

5 Likes

There have been a myriad of renderings but believe they will simply be mirrors of the first phase.

Progress on Phase 2. Screenshot from ASF_Construction

13 Likes
3 Likes