Phone pics from my walk earlier this morning. The northern and eastern crown facade was completed today.
Field condition answered my question on mitigating the solar effect of the concave facade today. Thanks to field condition for the great pictures .
Southern crown facade was completed this week. It looks like we have about 5 floors of cladding left.
https://www.instagram.com/p/CDsWOWiBqcL/
https://www.instagram.com/p/CDrTS3HDIbr/
https://www.instagram.com/p/CD4_pKBpols/
https://www.instagram.com/p/CD_Nxi5Ji1D/
Durst really delivered here.
https://www.instagram.com/p/CE648b6lI2G/
Withe video
This is pretty much enclosed on the North and East sides. They will probably finish the South side this week. Home stretch.
Right behind the train station in the foreground is actually this lot:
Good older pic, all the townhouses are still standing.
https://www.instagram.com/p/CEai3AClg5U/
https://www.instagram.com/p/CFCkr29jfCw/
From today. Facade is complete (except where the elevator is). Crane is lowering. This tower came out great despite the height cut.
The clock tower restoration is getting closer to completion.
I’m glad LIC got this curvy boi.
Crane playing hide’n seek
Looking good