NEW YORK | Perelman Performing Arts Center (PAC NYC) | 138 FT

Well he’s not a tourist or a general member of the public, it’s clear he was there as an employee of either the WTC or the Perelman as were the other trades people sitting on the bench, so we do know that.

Got some pics just now
Looks like they’re maybe setting up a stage?






19 Likes

Not sure if this video has been posted, the REX insta posted it today:

https://rex-ny.com/project/the-perelman-wtc/project-animation/

13 Likes

20 Likes

Ribbon cutting is scheduled for September 13th. First season program to be announced June 14th. This is also apparently being branded as “PAC NYC” rather than the Perelman. I’d personally rather see it called “The Performing Arts Center at 6 World Trade Center” but hey, who am I?

10 Likes

9 words versus a short catchy name…

Need something memorable

4 Likes

Say what you will about Bloomberg but he is a class act.

5 Likes

Forgot to post these a while ago (I think last weekend)


18 Likes

On another note, I took some pics from my friends place and will hopefully post them tomorrow or today if I have time.

As for the stuff going on on the Greenwich St side, theres some rebar sticking up in a uniform manner, but the plane its on looks a little too high to be the curb/bollards for the sidewalk, though it does seem to be in the correct location for the eventual boundary of the sidewalk around 2 WTC. We shall see in the coming weeks.

7 Likes

It’s so close on the south side, the 2 first planted trees don’t look like they’re doing so well. I hope they bounce back.

14 Likes

17 Likes

I love how all the cutting geometries were kept in the same grid for the entire building (besides the little back part), it’s a very meaningful move. This will looks real nice once it’s cleaned.

6 Likes

Sidenote but the 1WTC base BMU is out on the ground— most likely finally doing this season’s base light LED repairs (a bit later than usual)

2 Likes

I’d like to say that it’s just for cleaning because I’ve seen it out for several days now (over a week) and the LED’s are still out all over the place.

Usually it takes a month or so to see serious results

4 Likes

Does anyone know if they are still planning on having a soft opening before the official opening in September?

I’m wondering if the installation on the south corner is still planned. It’s only in the renderings from 2019, not the recent one’s

I believe it was removed when the base changed from marble to granite. There’s just going to be 3 display screens/signs instead.

1 Like

Credit:

22 Likes

It’s so OPEN! It’s a very imposing structure thats for sure.



21 Likes

Looks great!



27 Likes