NEW YORK | PAC NYC (Performing Arts Center at WTC) | 138 FT

There was a line of concrete trucks again this afternoon

6 Likes

They were still running the pump around 9 pm. Started setting up before 7 this morning. Long days for the concrete guys I guess

8 Likes

New crane being assembled. Could this be for superstructure work on the PAC?!

Looks like a pad for a crane is being built on the south end as well…very interesting.

9 Likes

Exciting. The internals of this building are complicated. And the outside is going to be high quality. Really look forward to this one.

6 Likes

yes, both cranes are for the superstructure. the south is arriving today

9 Likes

20190823 - 12:15 pm

9 Likes

Awesome!!! About time! Thanks!

3 Likes

They were still pumping concrete at 1:30 AM this morning. When I went by there were 3 trucks there.

8 Likes

The crane on the south side is mostly assembled now - Saturday afternoon. I was hoping to catch the assembly early this am when I went by and was surprised to see them pumping the cement.

3 Likes

20190824 - 3pm

11 Likes

there is still a lot of WBVA concrete to complete.

4 Likes


Steel approaches the PAC

16 Likes

20190827 - 01:15 PM


:slightly_smiling_face::grinning::smiley::upside_down_face::upside_down_face:

13 Likes

20190829 - 01:15 PM

20190829 - 02:15 PM

20190830 - 11:15 AM

10 Likes

:slightly_smiling_face:

20190904 - 3:00 PM

20190903 - 9:15 AM

8 Likes

11 Likes

Anyone know what all the scaffolding is west/south of the helix? Is it a frame for another concrete floor pour

1 Like

Looks like it’s for a concrete floor. Maybe the base with the steps leading to the public area is mixed with concrete and steel, then steel will be erected above

4 Likes

20190905 - 11:15 AM

20190905 - 10:00 AM
:smiley::grinning::slightly_smiling_face::upside_down_face::upside_down_face:

20190905 - 2:15 PM


:upside_down_face::upside_down_face::grinning::smiley:

8 Likes

North crane assembled and up

4 Likes