I think this one should be starting soon. I recall sources mentioning fall construction start.
I walked by on 10/6, and nothing was happening. As per Pizzarotti, however, it should start soon.
Tractor on site
Nice!!
Great update, Brooklyn.
Was re-reading some of the older posts (1st couple of ones), and boy, did we get lucky with the design. Imagine what it could of been.
/uploads/yimby/optimized/1X/7cdd363ed4a67bd2f1dd39d94812d276dcdcdd77_1_386x500.jpg
Compared to this:
I agree, Chris
Dear god @chris08876 you gave me a gag reflex when you reminded me of that horrid massing. Truly is the death of architecture.
I think any kid with a bucket of legos would agree that that old massing is hideous
slightly clearer rendering from an EB-5 website
http://eb5aig.net/recent-projects/45-broad-street/
according to this website, work was supposed to begin last October and end in 2019.
It looks great!
I desperately want this and 9 Dekalb to start!
Me too!
Hoping this starts soon. I’d like to see this rise at the same time as 9 Dekalb.
This article was posted on Pizzarotti’s website on 2-16_17.
Filed with the DOB on 3_16_17:
feel we are close to seeing some movement with this one.
I agree, Atticus