NEW YORK | 301-307 3rd Ave. | FT | FLOORS


This one has slowed a ton vertically, though it looks like they may be getting ready to install facade on lower floors. Surprised we haven’t gotten a rendering yet.

7 Likes

First setback has been reached

9 Likes



10 Likes

I believe this has topped out. Will post a few pics tomorrow.

2 Likes



8 Likes

Based on that cardboard cutout posted above this might have one more mechanical floor to go.

4 Likes
8 Likes
12 Likes



8 Likes