NEW YORK | 206-210 West 77th St | 225 FT | 18 FLOORS

Revealed: Naftali Group’s 210 West 77th Street

BY: NIKOLAI FEDAK ON SEPTEMBER 10TH 2014 AT 7:00 AM


210 West 77th Street, image by Thomas Juul-Hansen/Naftali

YIMBY has the first full rendering of the Naftali Group’s 210 West 77th Street, and the building’s design is impressive, significantly improving upon the structure it is replacing. Thomas Juul-Hansen is designing, and the 25 condominiums will be enormous, averaging over 3,000 square feet apiece.

Permits give the full breakdown, and the 18-story tower’s 78,485 residential square feet will be complemented by a 2,317 square-foot commercial component, housing retail. The site was purchased by Naftali for $55.5 million last spring, and the number of units has shrunk from an initial estimate of 30, which is not surprising given the demand for larger, family-sized apartments on the Upper West Side.

Juul-Hansen’s design is respectful of the neighborhood’s historic context, and grey bricks lining the exterior will be hand-formed, with Juliet balconies complementing mahogany-lined windows. The building’s mid-rise envelope will be flush with the sidewalk, further enhancing the streetscape.

The former 210 West 77th Street was an auto garage, and is currently being dismantled. Prohibitive red tape befriends restrictive zoning over most of the Upper West Side, and development is confined to a select handful of sites, Naftali’s being one of them. This is unfortunate given proximity to local and express subways at both 72nd and 79th Streets, where the 1, 2, 3, B, and C trains run, as transit infrastructure that could easily support additional density is already available.

Regardless of NIMBY-induced growth barriers, 210 West 77th Street is a positive step forward for a site that was formerly auto-centric, and sales have already begun, with prices currently ranging from $4.9 to $12 million. Goldstein Hill & West is the architect of record, and new building permits were approved in early August, which would signal that completion is likely one to two years out.

ZONING DIAGRAM

1 Like

Scaffolding is mostly down in front of the building and facade is now fully visible.

7 Likes

Thanks for joining chused! :slight_smile: We welcome you to our YIMBY family. May the boom live on!

1 Like

https://instagram.com/p/BJf5tHxAnmo/
@davidpalmieri

7 Likes





Tectonic

5 Likes

This whole building looks great. Especially the stacked stone facade.

1 Like

Even street level scaffolding now coming down.

6 Likes

Ground floor scaffolding is now gone. Sidewalk and ground floor finish work is on the way to completion. This building is basically finished.


6 Likes


TECTONIC

6 Likes