NEW ROCHELLE | 360 Huguenot | 285 FT | 28 FLOORS

Almost topped out. Just in time for Amazon to open HQ2 where the library currently is :joy::crossed_fingers:t3:

10 Likes

Final couple of floors going up.

6 Likes

Almost topped off (structurally) :tada::tada:

7 Likes


View from Huguenot St


View from Centre Ave and Main St


View from Centre Ave


View from Westchester Pl

5 Likes

March 3rd, 2018: Concrete poured for the retail portion next to the building. More to come. Facade detailing going on, check the second pic.

2 Likes

Topped out!

8 Likes

strong text

One last topped out shot

5 Likes

From the topping-out ceremony… that view is just amazing.

As for any actual news, they just delivered some glass earlier today, so I will try to get a pic soon

7 Likes

March 23rd, 2018

3 Likes

Humming along

7 Likes

Can’t wait to see the actual facade being installed. That one piece towards the base has been up there for over a month or two now.

1 Like

some extra confirmation of the height. I believe this is a DO-2 plot with a Standard 3 bonus.

https://www.newrochelleny.com/DocumentCenter/View/6823/Step-by-Step-Guide (includes the overlay map and community benefit factors)

2 Likes
5 Likes

New Rochelle’s first tower crane in over a decade disappears from the skyline overnight. Bittersweet.

7 Likes

Today!

@YIMBY - Would be a great opportunity to write an update article.

7 Likes

6/11/18

2 Likes

6/19/2018 - More glass being installed along with additional facade preparation

3 Likes

i’ll have to venture up the Palisades Parkway the next time i’m in the city. There’s a great view of the skyline from the lookouts near the state line.

1 Like

My photo from a few days ago (shooting on an iPhone 8 now)

5 Likes

Aug 17th

https://www.instagram.com/p/BmlDpqHH0QA/

3 Likes