MOUNT VERNON | Development News

216-222 Gramatan Avenue

https://www.lohud.com/story/news/local/westchester/mount-vernon/2025/08/27/mount-vernon-westchester-county-ny-high-rise-built-5-inches-from-house/85576830007/?gnt-cfr=1&gca-cat=p&gca-uir=true&gca-epti=z118643p119750n00----c00----e008600v118643b0042xxd004265&gca-ft=201&gca-ds=sophi


3 Likes

Work on Qwest Towers is progressing.

7 Likes

Phase 1 of Qwest Towers

The Opal

11 Likes

Qwest Tower 1 looks to be topped out.

Tower 2 is rising.

8 Likes
3 Likes

Qwest Tower One’s facade is on its way.

Qwest Tower Two has added a couple of more floors since the last update.

Not the best picture of the Opal but a few more floors have been added.

7 Likes

Update of Qwest Tower 2 with drone footage from ASF Construction

4 Likes