JERSEY CITY | Bergen-Lafayette Development

A restored train line would be cool but I guess a bike path is better than nothing.

2 Likes
4 Likes

I don’t have a picture, but biking past today I saw that foundation work is underway for 829 Garfield Ave, which is a 110-unit building:

4 Likes

Ahh, so that’s what that was. I noticed the active construction site as well while I was on the light rail back to West Side Ave. I really hope they re-think that green lol

3 Likes

Glad this one is under construction - this seemed like a pipe dream for a while, but the continued design updates made it seem like it was still alive. Guess it was.

1 Like

Two sites are starting up here:

95 Monitor St

And either 408-410 Whiton, or 412-418 Whiton

And from afar, Conifer Flats and The Ashton

6 Likes

From two weeks ago:

660 Grand St




666 Grand (parking lot with 4 story building proposed) in foreground

632 Grand site in background (4 stories)

678 Grand site in background (5 stories)

Recently cleared out lot behind Whitlock Cordage



Whitlock Cordage - actual, visible site work ongoing


408-420 Communipaw - fence looks clean and new and site is freshly cut

417 Communipaw site

374 Communipaw



Garabrant Phase 2 - renderings up on site. Uninspiring for the most part.



95 Monitor St

Conifer Flats - complete

Looked closer into the other pile driver here - it’s for 408-410 Whiton (8 story building). The site next door, the second phase of 313 Pine St (also 8 stories) hasn’t yet started.

306 Johnston Ave - no real movement, but I’m not sure that sign was there.

2 Likes

These are from mid August - I’ve taken some newer photos, but wanted to clear out some of the old stuff first, keep a record of what’s going on

902 Brewing Co finished up their tasting room and brewery. Not sure when, but it was open (for takeout) when I went by

Canal Crossing

Infrastructure work in the area (pumping station if I remember correctly)

Berry Lane Park - recently opened skatepark, and under construction pavilion

829-843 Garfield Ave - under construction. Significant building for the area - 5 stories and over 100 units.

632-652 Grand St - the fence is new if I’m not mistaken

Grand and Communipaw

660 and 666 Grand St

14 Ivy Place

Others

5 Likes

NJTransit is looking for proposals to build on one if its lots near Liberty State Park station. At two acres, it’s zoned for 8 stories and 500 to 800 apartments.

4 Likes

Interesting. There was once a hotel proposed for there, although I’m not sure how serious the proposal was (I think NJTransit pointed out they hadn’t been consulted). Looks like that’s dead at this point

Some updates from the area
342 Johnston Ave - fence fixed

95 Monitor St

374 Communipaw Ave

87 Van Horne St - permits recently pulled, but no movement on the site yet

Whitlock Mills - recently opened, after years of starts and stops

1052 Garfield Ave - this is a JCRA site. Not sure if it’s being cleared or that pile of rubble has always been there

503-509 Communipaw Ave

678-684 Grand St - piling

675 Grand St (nothing really here, just staging and infrastructure I believe)

5 Likes

2/17/21

17-19 Ash St is under construction

311 Pine St

313-321 Pine St - thought this was staging for the next door site, but not sure if it’s not starting up itself soon

Garabrant 2

95 Monitor St

297 Communipaw Ave - being demolished, not sure what’s going here

327 Communipaw Ave - recently cleared

374 Communipaw Ave

420 Communipaw Ave - the markers seem new, but maybe they just stay nice and new looking for a while

829 Garfield Ave - a little bit outside of what I’d call Bergen-Lafayette, but a big project nonetheless

678-684 Grand St

660 Grand St

656-658 Grand St - demolished

503-509 Communipaw Ave

8 Likes

All this infill is great! Thanks for these updates!

2 Likes

Couple weeks ago

656-658 Grand St

678-684 Grand St

374 Communipaw Ave

327 Communipaw Ave

297 Communipaw Ave

95 Monitor St

Garabrant 2 - foreground might also be owned by the same developer. Garabrant 3?

311 Pine St

342 Johnston Ave

17-19 Ash St

337 Johnston Ave - recently demolished, not sure what it’s being used for now or what its future is

3 Likes

17-19 Ash

Garabrant 2

311 Pine St

95 Monitor St

262 Johnston Ave - fenced, but it may have been previously

297 Communipaw Ave - large site, wonder what will get built here

327 Communipaw Ave

374 Communipaw Ave

503 Communipaw Ave

678-684 Grand St

660 and 666 Grand St - 660 is just about done, 666 starting

656 Grand St

4 Likes

Some from today
17-19 Ash St

408-410 Whiton St

Garabrant 2

262 Johnston Ave

95 Monitor Ave

278 Pine St - recently demolished

326 Pacific Ave

374 Communipaw Ave

327 Communipaw Ave

678 Grand St

666 Grand St

656 Grand St

632 Grand St

414 Whiton St (from a few months ago)

503 Communipaw Ave

13 Likes

Found this updated rendering for 503 Communipaw online. Not sure if this is the final one that we’ll get to see. Looks great though!

6 Likes

Looks close enough to what’s being built.

From last week:
The Hazel - complete

278 Pine St - demoed

408-410 Whiton St

412-414 Whiton St

17-19 Ash St

Garabrant 2

627 Grand St - new fire station under construction

678 Grand St - looks complete

656 and 666 Grand St

632-652 Grand St

475 Communipaw Ave - looks likely to be demolished soon

5 Likes

99 Monitor Street

369-371 Whiton Street

307 Bergen Avenue

2 Likes


Finishing touches and the base should be done next.

6 Likes

looks very good!