JERSEY CITY | 32 Oakland Ave | FT | 15 FLOORS

15-Story Complex Could Rise Over Jersey City Neighborhood with Almost 300 Units

While the property at 32 Oakland Avenue in the Journal Square section of Jersey City might just contain a nondescript surface parking lot now, the site could soon contain one of the tallest mixed-use developments in this part of the neighborhood.

A public notice shows that a 15-story building is being proposed for this property located at the corner of Washburn Street in Ward C. Should developer Overlook, LLC’s application for Preliminary and Final Major Site Plan approval with deviations such as maximum height and minimum retail depth be approved by the Jersey City Planning Board, the project would consist of 297 units along with commercial space on the ground floor. In addition, two floors of office space would be included in the building and 181 “automated parking spaces” would be provided on the premises.

5 Likes

This is a huge plot of land. Combine this with the plans for the new county courthouse next door, 345 Baldwin, and Journal Squared only a few blocks away, this place will get incredibly dense. They really need to address overcrowding on the PATH…

4 Likes

This is the area 2 weeks ago from the county courthouse. The site is on the upper right.

4 Likes
2 Likes

Opposition lol.

Some good unit counts too.

2 Likes

From Oron Zchut - some minor site prep going on. No building permits filed yet.

3 Likes

An older update (from 12/23), but all quiet on site then - and the same when I returned last weekend

1 Like

Excavator on site

5 Likes

Substantial excavation at this site (at least for JC, where most skyscrapers don’t have cellars). They’ve dug down most of the site to a depth varying between about 3 to 7 feet. Unsure if it’s for soil remediation or for construction. No construction permits have been filed or applied for yet, though foundation work often starts before the permit is filed.

5 Likes

The excavation is definitely for the foundation. Theyre going down to the bedrock. Looks like this one will probably be under construction pretty soon.

7 Likes

Update 6/16:

Piles are now on site and it looks like they will soon be in the ground.

This one will have two underground levels.

4 Likes

Today. More excavation.

4 Likes

Almost seems pointless to post these now, a week later

5 Likes

Included a nice graphic that showed the development next to the new courthouse

1 Like

Nice! It shows 626 Newark Ave and 532 Summit about 10 floors shorter than they’ll be, but it gives you a decent idea of what the area will ultimately look like. Still not a fan of the courthouse design itself, though. Should’ve built that in Secaucus.

2 Likes

Yeah, they both look way shorter on this diagram… But the park will really activate the area, can’t wait! And I’m not even commenting on the courthouse… Everyone has universally panned the design as awful haha

3 pile drivers for some reason


5 Likes

Today

6 Likes

Yesterday

4 Likes

4 Likes