JERSEY CITY | 262 Johnston Ave (The Atlas) | 290 FT | 25 FLOORS

The project proposes a (2)-story base with (5) interior parking spaces and 8,776 SF of commercial/retail space. The tower will contain 22 residential floors with 169 units. The 25th floor will be utilized for indoor and outdoor amenity. Two visitor parking spaces are allocated outside in the private drive. An outdoor patio is proposed for the ground floor commercial/retail. The “Sewer Easement Height Bonus” of the Morris Canal Redevelopment Plan XI(A)(4)(c)(xi) is being utilized for the project. The project will contain 6.5% affordable housing as required in the Morris Canal Redevelopment Plan XI(A)(4)(c)(ix).

Would replace a 1-story warehouse near the Liberty State Park light rail station near Lafayette Park.

8 Likes

Renderings and elevations from the site plan application

https://data.jerseycitynj.gov/api/datasets/1.0/p20-109-262-johnston-av/attachments/4_arch_plans_203f23_1_pdf/

10 Likes

New renders

The tower is good filler

12 Likes

I’m not sure if this fence has been here forever or not. Still, good to start somewhere with keeping track

6 Likes

Demo permit for the existing structure was issued yesterday. Demo should be commencing soon!

7 Likes

Photo posted today 8.21.21. Site has been demo’ed. Interested in how quick this one is moving. Also looks like they’re already looking for a retail tenant.

5 Likes


Found this on an Instagram ad

8 Likes

Piling rig now on site

10 Likes

Looks like the piling rig was just there for test piles (it’s gone today), but presumably it’ll be back

7 Likes

Setting up more permanent rig today it seems. Also more materials on site.


10 Likes

They received their construction permits yesterday.

1 Like

What a very distinct and out-of-the-blue location for a highrise! Just like the one being built on 26-28 Van Reipen Avenue.

1 Like

a friend took this:

not the greatest shot, but shows that columns are going up for the first floor.

6 Likes

second floor going up (taken by a friend):

8 Likes

5 Likes

Interesting that a crane has not gone up here.

7 Likes

Looks like they’re doing about a floor a week. So will probably top-out in late winter.

5 Likes



This week, last two photos are yesterday. Can see the windows being installed.

I count 19 floors with the 20th being poured. So 5 more floors to go. While not remarkable for JC, this building is super prominent in its area, the next tallest building is only 8 floors. Also they’ve been building this super fast. 12 floors in about 8 weeks.

8 Likes

Few more floors before it’s topped out. Facade looks great!

8 Likes

photo by a friend. 23 of 25 floors done