This is the first time i’ve posted on a non-New York topic, but I assume this is at the halfway point.
2 Likes
It’s still under the halfway point, but it should reach halfway in the next few months
2 Likes
"Latest Updates on Jeddah Tower
Raising of formwork to the 103rd floor
Selection of Chinese company Jinggong Steel International to execute the steel portion of Jeddah Tower
Steel used: Jinggong Steel has dedicated four fully customized intelligent production lines to manufacture ultra-high-strength and resistant (S690) steel
Continued installation of glass on all facades"
8 Likes
Are any floor numbers skipped (like 13 in the west)?