HOBOKEN | Hoboken Yards Redevelopment | (4 Buildings) |10-27 FLOORS

:woman_facepalming: ugh

2 Likes
4 Likes


21 Likes

21 Likes


I spy a facade going up :eyes:

13 Likes

14 Likes
20 Likes






26 Likes

someone did a world tour yesterday

6 Likes

Based on? :roll_eyes::roll_eyes:

The pedestrian plaza replacing a block of Observer Highway outside of Hoboken Terminal has officially opened to the public today.

25 Likes

Taken at the Summit


20 Likes

18 Likes

17 Likes

15 Likes


23 Likes

The new complex at Site 1 would include residences, office space for NJ Transit, and ground-floor retail. Rendering courtesy of Morris Adjmi Architects.

An upcoming phase of a massive Hoboken undertaking has been redesigned significantly and is hoping to swap out an approved office complex for a mixed-use building that has a smaller ground-floor footprint.

During a community meeting, officials from NJ Transit and LCOR revealed planned changes they hope to enact for Hoboken Connect.

LCOR is looking to change an approved office component of Hoboken Connect into a thinner mixed-use complex with affordable housing. Image courtesy LCOR.

The company is looking for redevelopment changes to an already approved office tower that would rise at Site 1. The property, which sits directly next to the entrance to the PATH train, is approved for a 21-story, 704,355-square-foot office building that features ground-floor retail.

But LCOR representatives claimed during the community meeting that an office building on Site 1 is not economically feasible, as three years of pre-leasing efforts have generated “zero interest” from prospective tenants. As a result, they hope to shift gears and have brought on Morris Adjmi Architects to design a new vision for the land.

The street level of the proposed Site 1. Rendering courtesy of Morris Adjmi Architects.

Instead of the office building, LCOR envisions 365 residential rental units in a building with diverse uses. Under their proposed plan, the rental homes would break down as 70% market rate, 10% workforce housing, and 20% set-aside low/moderate income housing.

The first few floors of the property would include office space for NJ Transit, which would pay rent for about 23,000 square feet of space. The City of Hoboken would also get almost 16,000 square feet of office space rent-free under the proposed deal.

The ground floor of the property would still add to the streetscape, including 5,600 square feet of retail space split between two storefronts.

The view from the waterfront of Site 1, with the soon-to-be-completed Charlie in the skyline. Rendering courtesy of Morris Adjmi Architects.

The new design of the building features about 34% less gross square footage and would leave an existing bus lane in the area clear, with no building over it, as the previous plan included. The entirety of the new building would include 29 floors, making it slightly taller than the nearby Charlie property.

Over the next 15 months, LCOR plans to pursue amendments to the redevelopment plan that governs the area along with the design and approvals for the building.

ttps://jerseydigs.com/hoboken-connect-site-1-development/

12 Likes

^^

22 Likes

Very nice!

1 Like

18 Likes