Chicago | 1000M (1000 S Michigan Ave) | 805 FT | 73 FLOORS

Oooh here we go. I had a feeling things would be shut down again, it’s only gonna get worse around this country

1 Like

It’ll get worse, then better. This is going to take time.

1 Like

https://www.chicagoarchitecture.org/2020/07/18/what-a-covid-19-construction-stoppage-looks-like/

2 Likes

https://www.chicagoarchitecture.org/2020/08/03/construction-workers-back-at-1000m-after-covid-19-shutdown/?fbclid=IwAR295LP5mdesqx_rwI8POwyqqzLmObaGHXAAcpMw6h-vfhdUyjo5Ggwc-ao

5 Likes

Here’s an update for ya!! :slight_smile: looks like it’s starting!! :smiley:

(@Le Baron)

11 Likes

I know I’m not supposed to post bad news on these forums. I’m sorry YIMBY. Feel free to delete.

https://www.chicagoarchitecture.org/2020/08/10/hopes-dashed-michigan-avenue-skyscraper-remains-on-hold/

3 Likes

It’s only the Ostriches that don’t want to see what is really happening.

4 Likes

From my 3D model of Chicago

8 Likes
5 Likes

Chicago sure loves height cuts. Frustrating.

4 Likes

Let’s just be relieved that it wasn’t that drastic this time.

1 Like

4 Likes

a cantlevering 50 West Street

2 Likes

4th Ward community meeting

https://us02web.zoom.us/webinar/register/WN_F3hZwweXQt-zUrG-LpY6fw

3 Likes

Sure hope this building is finished in memory of Helmut Jahn. Sad passing…

4 Likes

^^ Totally agree. Looks like construction is resuming very soon!

5 Likes
5 Likes
7 Likes

This project is definitely one of my favorites going up right now. The only negative is the 300-car parking garage, as it’s less than 0.5 miles to red, orange, and green lines

3 Likes

It’s expensive enough that people are going to want to have a car for trips out of town, groceries etc.

1 Like