AUSTIN | Waterline (98 Red River) | 1,024 FT | FLOORS

Per the ATX:

Crane #1 is going up today.

4 Likes
1 Like

The official building’s name is Waterline. It is scheduled to be completed sometime in late 2026.

3 Likes

This building is very nice. Hopefully Austin gets those other 2 potential supertalls as well.

2 Likes

It looks really lame.

3 Likes

Three potential supertalls

4 Likes
5 Likes

Per ATX:
The second of three Luffing cranes is going up this weekend.

5 Likes


9 Likes

Just wondering, is this Eugene’s final design since his passing? I know 1000M is in Chicago, by Helmut Jahn

I would need to check back with you, but no, I do not believe it was. I’m pretty sure One Vanderbilt was one of Kohn’s last major projects. Kohn was not a part of the team working on Waterline.

Edit:
No, Kohn was not apart of the team working on Waterline and One Vanderbilt was the last major project he was on a team for, though he was just on the team, he did not design it.

3 Likes
5 Likes

From the article:

5 Likes

From gillynova at SSP:


12 Likes

From riverranchdrone at SSP.









9 Likes

Love the cladding on this one.

4 Likes

Two new drone videos from Curlee Capital.

5 Likes

From Urbannizer at SSP.

Level 15

7 Likes