21 Likes
Haven’t grabbed a picture but this is zipped up in the back. All that should be left externally is lighting.
8 Likes
A whole bunch of blah just like the rest of LIC, im hoping the LIC waterfront rezoning brings some much needed differing styles of architecture to LIC…
5 Likes
Don’t hold your breath.
13 Likes
12 Likes
It’s a shame that there is no crown lighting like in the rendering
Rendering
My photos
March 1, 2026.
16 Likes
damn looks like a lot of folks moved in already
1 Like
















