NEW YORK | LaGuardia Airport Access / AirTrain

You joined this forum for “group participation” and you got it. It just so happens you got a reply that you didn’t like.

I don’t think anyone including myself is trying to one-up anyone here especially when all you got was feedback by another member and my post regarding concerns about redundancy and why single-tracking a rapid transit line isn’t the best of ideas. Wouldn’t it be more sensible to look at that criticism and see how it can be used to improve the proposal by taking into account issues regarding redundancy which helps contribute to a reliable service? With that in mind, I recommend that you have some patience and consideration before basically devolving into bonafide personal attacks by calling me “inconsiderate” and “inpatient” because I criticised this proposal which it seems you didn’t like. This isn’t an echo-chamber but instead, a public forum containing people who may have different viewpoints on a topic so an expectation of some discourse when discussing a proposal like this is to be expected.

Short-haul two-track systems can have redundancy if it is planned right. Installation of some cross-over trackage for example can easily allow trains to be shifted to one side while another side is taken out of service for planned work.
image

I’ve taken the liberty to mention some short systems such Glasgow subway (10.5km), the Catania Metro which is only 5 miles in length and also the former Line 3 Scarborough in Toronto which was a short-distance system that ran for 4 miles and these are generally double-tracked which provided a degree of redundancy.

This I can agree with. If there’s any incident or issue larger than just a stalled train, then there’s probably a bigger issue on hand and having a chunk of the line wiped out most definitely applies to both double and single-track railways. But that’s not what I’m emphasizing in my concerns about redundancy. I emphasized the issues regarding ensuring service remains somewhat consistent with more common things such as track work, etc. Having redundancy, especially a line to the airport is quite important since if the single-tracked line is down for maintenance, people will instead take to the roadways in automobiles which will contribute to more road traffic, etc. which defeats the entire purpose of building a railway to LGA.

1 Like

So much to refute. Because there exists two tracks does not prove redundancy. That switches exist usually means they are a part of the system operation. Maintenance is not a system stopper!!! Whatever minimum maintenance needs being done would be done during NON-operating hours. Stop being so infuriating. You are not posing valid questions that could be answered politely, you began by bombastically saying this is Dead on Arrival because it is fundamentally flawed; ergo go back to the drawing board.

YOU completely IGNORE the BENEFITS that are derived in this situation, where double tracking produces VAST obstacles, that clearly NO ONE has overcome. So ENJOY your buses!!! EGADS! Steve Jobs didn’t have this much trouble getting across a completely new concept. This concept is as old as railroads themselves.

Hey, Waymond. This is a reply using the email notification, so I haven’t a clue how it shows up on the site. The site limited me to 4 (yes, four) comments. Ugh.

I hope you saw the graphic addressing your inquiry and additional comment I added to my last one. I also added some links to the “rest of the story.”

Seems some on the site cannot conceive of anything beyond what they have experienced.

In fact, this has been vetted by TWO civil engineering college department heads. You sometimes have to make do with what you got, and in this case we got an open rail bed almost from Manhattan virtually all the way to Woodside in Queens. If you found the link and followed it, you saw the operation schematic, which presents how the system would work, distances and times between stations, among other important data.
The ONLY REAL engineering challenge is handling the meeting of the two branch trains on the same track at the Astoria-Ditmars station. I am certain it can be done, and if need be I will freaking engineer it myself. While our private sector is innovative, our public sector (govt) is completely incompetent. Not true in other developed countries, where there is some national pride taken.
Another good element of the plan is that it can actually be implemented in three stages. The airport branch first, then the other two can be done separately as well. However, it is important (almost vital) that the 125th tunnel and station are included in the S.A.S. Phase Two project. For the best function, the station would need to go directly below the new 2nd Ave Subway 125th station. This is why people need to speak up. MAKE the politicians pay attention. Otherwise they will later say, well it is too costly to afterwards go back and do the work, so scrap the Manhattan/Harlem branch. All because of apathy.

3 Likes

at this point just make it rail…

4 Likes

They should but they won’t, and even these bus “upgrades” are pathetically mediocre to say the least.

2 Likes

I agree. There was a proposal to extend the N train to the. Airport not long ago, but opposition arose because elevated tracks were in the mix. Sure would be great if some way could be found to put in a rail transit connection. Same is true for JFK.

1 Like

personally I think there needs to be a lirr type or rail that goes from the airports to like Penn/the oculus. it’ll reduce soooo much traffic in the area because a good chunk of people flying in are going to the city. also as a flyer, who wouldn’t want a one seat ride to your destination, especially after a flight? most developed cities have an airport train that goes from the airport to the city center.

4 Likes

I certainly don’t know bject to a one seat ride. LIRR is not too far from either airport but I don’t know if a route is possible.

Agree. I’ve traveled to cities like London and Beijing that have an express train to the airport, and man… it really makes the whole experience so much better. Air travel can be stressful enough for many reasons… so making the land part of the journey as smooth as possible really makes a difference in how I feel about returning to that city, for business or pleasure.

1 Like

There was once an express train from Times Square to JFK (just Howard Beach station, of course), I think. It used some lower-level platform at Times Square that was then abandoned, and has since been bisected by the 7 train extension to Hudson Yards.

I’ve also read that the MTA once studied a one-seat ride from Penn Station to JFK proper, that would use special trains that could operate on both LIRR and AirTrain tracks. It’s technically possible, but it would require wildly custom dual-mode trains that could not only use two different modes of propulsion, but I think they would require adjustable height as well. Crazier things have been made… I think there are trains is Switzerland that can use two different track gauges. And plenty of trains can operate on different voltages. But it’s always more costly to make train like that, and testing and ongoing maintenance costs go up as well.

2 Likes

There was. It got killed due to poor ridership and was essentially just a super-express that made extremely limited stops with passengers transferring to a bus to reach the terminals. It didn’t originate from Times Square’s lower level though.

2 Likes

That’s what bothered me about the 7 train extension.

Oh, you’re right. I was confusing the JFK express train with the Aqueduct Race Track express train. Similar concept, but not the same.
https://www.nytimes.com/2008/04/20/nyregion/thecity/20port.html

8 Likes

Queens residents voted this down many years ago.

They should study building this connection as a subway. Extend the El up 31st Street and then when it turns at 19th Avenue run the link underground all the way to the airport.

3 Likes

As I recall the old idea said it would have to go underground at some point because of the flight paths.

1 Like