NEW YORK | JFK Airport Renovation/Upgrades

As expected from my site visit, Air India has selected T6 for its move! They’ll move once phase 2 opens in 2028, and will open a flagship Majaraja Lounge spanning almost 10,000 sf.

https://www.morningstar.com/news/pr-newswire/20260721ny08608/air-india-selects-new-jfk-terminal-6-for-future-operations

4 Likes

As expected. Looks like terminal 6 will be a flagship for Lufthansa group and many Star Alliance airlines.

2 Likes

A few more photos from LinkedIn (LinkedIn Login, Sign in | LinkedIn)

18 Likes

Cool shot of the oculus in Terminal 6 (Source)

12 Likes

I really hope that both of these terminals open in 2026.Feels to me that it may slip to 2027.

JFK T1 on LinkedIn just posted a bunch of photos where the Queens borough President received and was shown project updates.

13 Likes

Womp womp

7 Likes

clap if you’re surprised

Kuzco and Pacha's Awkward Silence

2 Likes

Here are some new photos from the JFK T1 team showing interior progress so far. Looks like directional signage is going up even in areas that are obviously incomplete.

18 Likes

Some shots of the TSA screening machines in Terminal One (link)

15 Likes

Can’t wait for the opening.

2 Likes