this is not a real proposal. i think we should point this out before anyone gets excited. Imagine the hubris it takes to propose something for a project site that you have nothing to do with or own/lease.
Per: NYguy SSP
Biden to announce $292 million for Hudson rail tunnel project during NYC visit
BY KEVIN FREY
JAN. 30, 2023
Quote:
President Joe Biden is poised to formally announce a nearly $300 million grant Tuesday to help complete an early phase of the Hudson Tunnel project, part of the long-delayed Gateway Program.
Biden will tout the $292 million “mega” grant, created by the Bipartisan Infrastructure Law he signed in 2021, during a visit to New York City.
According to the White House, the money will go toward completing the final section of concrete casing near Hudson Yards, protecting the right-of-way for the future tracks connecting Penn Station to the river’s edge
A spokesman for the Gateway program said the aim is to begin construction this year on the new section, noting the grant expedites the process of lining up the necessary funding to proceed. It is one piece of the massive Gateway project, which is expected to receive several billion dollars under the infrastructure law.
Too bad it doesn’t help spur the actual construction of Phase II.
~$300M is all well and good, but Gateway will cost $20-25B by the time its completed.
That probably doesn’t include the cost of refurbishing the North River tunnels in the years after Gateway is completed.
Chris Christie might be infamous for the George Washington Bridge incident, but cancelling the ARC 12 years ago might have been more costly…like a mini-Brexit for the NYC area.
I worry that most of Phase 2 won’t even start construction until 2030 or later, even if the casino here was approved.
Aside from the “complete” estimate of the overall Gateway project, the $300 million is only for the rest of the tunnel that runs under the Hudson Yards platforms, so it doesn’t really matter how much the overall cost of the project is so long as this portion is completed because, as it relates to HY, trying to build the tunnel after the platform is completed would be more difficult and costly.
As it relates to the overall development of Phase II, Related has said in many press releases relating to the casino that it would help spur the rest of development at Phase II because it would get the west platform construction going, which is one of the main construction hurdles right now.
I don’t think it will immediately fast track it more than having it be the chosen site for the casino resort, but it will certainly be easier to build/less costly then if Phase II was already under construction and the platform built. What is preventing commencement of Phase II is the approvals for the west platform to begin construction as it’s been constantly delayed for a number of years now.
They are definitely nice renders that show what the plan for the deck was but in general, I’d assume they were never really circulated because there was no definitive design for the buildings in Phase II and because the platform construction was never approved, there was not really a need to continue to circulate them in the case that things changed as there was some negative feedback as to how the platform walled up against 12th Ave, a factor that can not be avoided due to the changing terrain of NYC and the railyard itself. I think many people are even unaware that 33rd St between 11th and 10th Ave was brought up several feet to be level so that the platform could be built “above” the railyard.
Hudson Yards Phase Two
Is a unbuilt
Why is that something to be sad about? I understand the language barrier, but there is a difference between unbuilt and cancelled, this project is not cancelled by any means.
Thanks, I didn’t understand that, I have to write more slowly.
i’m doing something wrong…
Still, a general outlook as to massing and stuff like that is valuable. I also think that the whole shish kebab over 12th avenue (sorry if I’m bad with the text, I’m on a few beers tonight) is really overblown because it’s clear from the renderings that the wall will only go so tall as the floor of the high line. Now, if they could connect the green space on the platform with the green space on the high line, that would really be Chef’s Kiss nice.
I agree about the valuable part as it still shows an “aspect” of a future project, but like this iteration of it where the edge of it kind of steps down and turns into a seating/bleacher like setting. I personally neither agree nor disagree with the wall objection, because, on one side, it has to be there, but on the other, I feel like it could be perceived as being kind of unwelcoming on the 12th Ave side. But overall, that iteration has it depicted as being about 6’ higher than the walking path elevation of the highline.
Ironically, there is a portion mid block on the highline along 12th Ave where there is a break in the greenery that aligns with what is technically the continuation of 32nd st, I’d imagine that that was done intentionally so that a connection could possibly be made to whatever development would eventually be built on the railyards. That connection is quite possibly out of view on the bottom right corner of the first image you attached where the stairs lead down.
Looks like there’s a set of stairs between the platform green space and the high line. My question is why not extend it down the whole western flank and make a truly welcoming entrance to hudson yards? Guess we’ll never know!
Well as shown in the left diagram in the 2nd photo you attached to your previous post, you can see that the end of the railyard stops short of the portion where the highline supports actually begin, so there would not be enough head height for the trains to be parked in their normal spots.
That is unless you are talking about joining the highline with the deck and not the 12th Ave sidewalk with the deck, though I would now assume you meant the former. If you’re talking about joining the highline in particular to the deck portion of Phase II, they would have to destroy the landscaping that has been designed on that side of the highline, the landscaping is only on the east facing (inward facing) side of the walkway, the opposite side closest to the Hudson is all walkway.
This is a good site for a:
new MSG or
Two megatalls or
Casino
Or whatever else happens to float into your mind
I like the concept of the
Sky High Tower over 2000 feet
Or
The MSG 5 concept by Mackensen
Okay, so let’s entertain this. Tell me how exactly you would get 2 2000 ft tall skyscrapers into HY, when the plans have the skyscrapers shrinking in height as they approach the Hudson?


