NEW YORK | Gowanus Canal Rezoning

Yes, exactly

six stories for 440 Carroll feels undersized compared to the surrounding new construction

3 Likes

Gowanus Green Building A
Construction start: 2026

17 Likes

I love the scale of this project and the site planning for the most part feels right, but the architecture could really use a little something extra.

9 Likes

if youre buidling this development from scratch why dont they just build curb extensons instead of painting the road (referring to 2nd pic)

6 Likes

18 Likes

My educated guess is that this Luquer St extension, being a city street and not privately owned, adheres to DOT specifications, and for whatever reason, including minimum turning radius for max scaled vehicle types and/or fire and emergency egress amongst others, a bulbout was not permitted here.

7 Likes

Showing this image as part of the Arts Gowanus booth @ Affordable Art Fair (curated by Miska Draskoczy).

4 Likes

12 Likes

Union st. - it is the lot next door to Dinosaur BBQ

14 Likes

snapped a pic of the lot not too long ago

4 Likes

Another brewery for Gowanus

7 Likes

There’s a thread just for the Gowanus Green development. Maybe it should be merged with this one? Dunno.

2 Likes
10 Likes

The new park at 395 Carroll is looking promising :joy:

17 Likes

bruh.

2 Likes

Seems like it was always going to be heavy on the pavement side, compared to the other developments. SCAPE has done a great job with others, hopefully this one hasn’t been VE’d too badly.

10 Likes

The optics are bad but the park will be fine.
I think the slab is only there for structure and drainage.

11 Likes

Great point, looking forward to the final product.

5 Likes

This one is back from the dead, confirmed by a worker, they are finally going vertical
Trying the carrousel feature for the first time

BIG’s project across the canal also showing signs of life

16 Likes