Here’s another Portal Bridge update from NJ Transit:


Trains are already using the 2nd track on the new bridge, and final work involves connecting the tracks to the existing viaduct that leads to the outermost platforms at Secaucus. Demolition is now underway on the old bridge as well, with tracks being dismantled and wiring taken down.

As for the 2nd TBM, the “Hudson Tunnel Project” badge was taken off the cutter head.


The TBM itself is also physically complete. Sometime this month, the 2nd machine will be launched, commencing construction of the 2nd tube. The 1st TBM at this point will already be almost fully into the Palisades.

20 Likes

The 2nd Tunnel is soon to be underway. The 2nd TBM is fully assembled and has started inching forward to bring the cutter head to the rock face. The 1st TBM is almost fully into the ground. With each TBM being around 500 feet long, that means almost 500 feet of new tunnel has been dug so far.


Tunnel segments and a train that carries both tunnel segments and rock spoils are also in place.

21 Likes

Excellent

During this phase the TBM’s encounter the hardest rock so I would assume speed increases once they reach sedimentary river section, no? I seem to recall that the heads needed to be adjusted to account for the change in soil composition…

2 Likes

There will be seperate TBMs for the river segment. The river segment is also longer. GDC also states each TBM digs about 30 feet per day which is average for single-shield TBMs.
I expect the soft-rock TBM to be faster since it needs less force to cut through rock and silt. The hard rock TBMs in this segment need to put high pressure on the rock face to break it apart which may slow speeds down and cause more wear on the cutter disks on the actual cutter head.

And, the 2nd TBM has started digging this morning. Rock is on the conveyor and the cutter head is now chewing at the rock face.

20 Likes

The 1st set of liners for the 2nd tube was installed today.


In a couple more days, the 1st TBM will be fully inside the tunnel.

Some other work is going on at the tunnel box, with concrete finally being poured on part of the retaining wall that has been missing for a few months.

It’s also worth noting that the Portal Bridge cutover project will be complete by this weekend, fully restoring service to and from NY Penn on Sunday, just in time for the new workweek.

I also learned about how the cross-passages between the two tubes will be dug. Essentially, a miniature TBM will be deployed that digs and places pre-cast liners. The TBM is then retrieved and moved to the next location where the next passage will be dug.

17 Likes

What are they doing with all the spoil from the tunnels?

3 Likes

There’s a big spoil pile on the other side of the Tonnelle Ave bridge that is emptied out periodically.

10 Likes

With the Portal Bridge project finishing up tomorrow, the tabloids are getting to work, calling the project a “fraud”, “waste of taxpayer money” and a “boondoggle”. Someone clearly never had their train delayed because of the bridge getting stuck.

Per the author, the reason the 116-year old bridge kept getting suck was because Amtrak was “not maintaining it”. They also suggested that the replacement be a new moveable bascule bridge despite that not improving speeds and maintains a critical a point of failure.

the old bridge did sometimes get stuck when it opened, that was Amtrak’s fault for not maintaining it. What should have been built is a new, modern movable bascule bridge at perhaps $200 million, a fraction of the $1.7 billion price tag, which New York has to match New Jersey’s share.

8 Likes

connecticut river bridge being built right now is a bascule and its $1.5bn.

this guy is out of his mind.

did the tied arch at portal cost more because its architecturally better than a simple span, sure. should infrastructure that will be there for 100 years look good, yes.

13 Likes

$200 million.

That’s a good one. In 1980 maybe.

6 Likes

Amtrak and NJ Transit both have announced the completion of the Portal Bridge. Fulll service is restored and the old bridge is now being demolished.

A snippet from an NJT Video shows the completed bridge:

Look closely: the removal of the tracks on the old bridge is underway; the catenary is gone, and half of the high-voltage transmission lines have been removed.

And here is a full timelapse of the bridge construction:

11 Likes

The GDC has officially announced the start of the 2nd tunnel. Quite a late announcement, since I reported that work started last week, well before the official announcement with the TBM.

Official Announcement:

14 Likes

Here’s a video from yesterday showing a ride over the now-finished Portal Bridge. The thing of note is that all the timbers that support the tracks on the northern half of the Old Portal Bridge have been removed. A barge with cranes is in place as well, indicating that demolition is now fully underway and that, at some point, the actual bridge will be dismantled. The tracks on that half have also been fully ripped up, with track removal soon taking place on the southern half.

11 Likes

Porter Bridge :sweat_smile:

4 Likes
11 Likes

Here’s some awesome drone footage of the Palisades tunnel site and the TBMs.

The video does not reflect current progress: The 1st TBM is already fully into the tunnel, and forced-air ventilation ductwork is now being installed. The 2nd TBM is also picking up speed, with the tunneling shield fully into the Palisades rockface.
The video is still an excellent watch because it does provide accurate information on a number of Gateway happenings, and also explains how the TBMs work and the river ground stabilization.

22 Likes

Great, very well-made video!

This channel is a great place to keep track of project progress.

5 Likes