NEW YORK | 80-100 Flatbush Avenue (Alloy Block) | 482 FT + 725 FT | 40 + 63 FLOORS

finishing touches at the base:




new cafe inside the lobby

21 Likes

17 Likes

WB Savings building is getting hemmed in.

Washing Windows

13 Likes
1 Like

Paywall or something that is keeping me from reading. Care to summarize?

I am not sure, but I think this free article has the same or similar scope of information.

1 Like

Brooklyn-based developer Alloy Development has secured a $290 million recapitalization for its mixed-use project, The Alloy Block, at 505 State Street in Downtown Brooklyn.

Commercial Observer has learned the firm has simultaneously secured a $42.5 million construction loan from Maxim Capita, a New York-based, bridge and balance sheet lender, to complete the second phase of construction at The Alloy Block, directly next to 505 State Street on a site that will include additional mixed-income apartments as well as office and retail spaces.

Construction on the second phase of The Alloy Block is slated to begin in 2025.

New York Life provided the five-year, fixed-rate senior loan for the recapitalization, with the JLL Capital Markets team of Christopher Peck, Peter Rotchford and Nicco Lupo representing Alloy on the recapitalization.

Adjacent to Downtown Brooklyn’s Atlantic Avenue and Barclays Center subway station, 505 State Street includes New York City’s first all-electric residential tower at 100 Flatbush Avenue. Construction on that 44-story, 440-unit building with 28,752 square feet of retail space was completed earlier this year. Two public schools are now open on the site as well.

Alloy began construction on the project in 2019, with demolition of an existing structure on the site. After some delays, Alloy formally began construction in July 2021 after receiving a $240 million construction loan from Goldman Sachs, Related Companies and Ares Management.

JLL’s Peck said in a statement that 505 State Street “exemplifies cutting-edge sustainable development,” and lauded Alloy Development’s focus on environmental consideration in its New York portfolio. Alloy’s properties include 240 Nassau Street, the result of a deal whose acquisition was financed by Maxim last month.

“This transaction demonstrates how thoughtful investment can yield both financial rewards and positive societal impact, particularly as sustainability becomes an increasingly crucial factor for lenders,” Peck said.

6 Likes

‘Second phase’ being 80 Flatbush, I assume?

Also, thanks for posting the article.

1 Like

18 Likes

16 Likes


https://www.instagram.com/skyalign/p/DF2iW5-MEa0/

Phase 2

„ The filing with the second-highest floor count is 376 Schermerhorn Street in Downtown Brooklyn. With a permit height of 753 feet (again, lightly higher if including an ornamental top), the skyscraper will become the borough’s second-tallest after the 1,067-foot-tall Brooklyn Tower completed at 9 DeKalb Street in 2023. “

13 Likes

27 Likes

You keep outdoing yourself!

2 Likes

Thanks! really appreciate it

1 Like

Phase Two

https://www.bloomberg.com/news/articles/2025-02-18/brooklyn-rental-tower-to-set-new-record-in-sustainability-push?srnd=energy

13 Likes

“ Alloy Development’s 63-story skyscraper is designed to meet “passive house” standards, including use of airtight insulation and heat recovery. Construction is expected to start this summer and once it tops out at 725 feet (221 meters), it would be the world’s tallest passive house, surpassing a 586-foot condo project that’s underway in Vancouver.”

3 Likes

This is the thread to Phase 2

Like Phase Two about Alloy has its own thread? as this is a two phase development.
Yes, and this has been known for some time that a second and taller tower is coming here. Can we please discuss the second phase in this thread and not separately.

2 Likes