Photos by Michael Young
It took six months for this tower to reach just over halfway up, I assume this could top out by September
They’re doing the glass. I am blessed.
Finally!! Nice industrial look!
The Miesian corner. ![]()
Since the façade installation has started, let’s see how quickly the glass installation progresses.
Wow only two columns on the east face? And they’re not on the corners…that’s impressive
Im assuming the core wall is supporting those slabs making perimeter columns in that space unneccesary?
I was thinking that. But
Based on the elevation on the right, the core is nearly parallel and nearly flush on the west face
Core is on the east face, though not all the way.
The right section is looking south, left is east, right is west on it. You can actually very slightly see the core openings through the safety netting.

























