How long until work continues on this?
I know the developers are working asbestos they can to get construction up and running again.
OK, this is a decent contextural building for the Upper West Side. The Central Park facing east facade is especially good which makes sense since that is the side appreciated from a distance in the park. The south facing side is pretty much obscured by 50 W 66th St. The big question remains, what will the monster down the street look like? I would not count on the present drawings.
The Majestic Century is the obvious reference point for 37 W 66th.
Did it start back up?
Meanwhile, the stop work order issued on the site in July after asbestos turned up during demolition has been lifted, with about a week of remediation left.
Everything has gotten so expensive -
This costs more then 270 park and 350 park, wtf.
What is this?
The smaller building is the building attached at the end of the podium to the larger building.
Kinda made a guess as to what it would look like based off of the axon and the rendering of the shorter tower.
Fantastic work, thank you very much.
That would be the northernmost supertall.
More supertalls, please.
More shadows on the park.
big bertha
Nice work as always. Here’s hoping they go all-out on the crown to give the UWS a worthy pinnacle.