NEW YORK | 270 Park Ave | 1,389 FT | 70 FLOORS

The majority of the foundation is built around/within the train shed. They re-used the existing foundation and reinforced as needed. That work occurred below grade and was completed during the demo. There are eight sets of interior fan columns (four each north and south) and six sets of exterior fan columns (three each north and south). These are the only points “touching ground”. Eight sets are now complete as visible in the photo above.

6 Likes

The foundation work probably started late 2019 - early 2020, they had to be started early as it was getting in the way of the schedule of the East Side access project. It was built around the existing building which made it easier once the old 270 Park was demolished. Just as Jeffrey says, the points touching the ground makes it easy to connect together. When I went down to the East Side access site early March 2020, they were already quite far into building these foundations.

Found this pdf detailing the scope of the work. It’s dated March 2019.

8 Likes

Thanks!

2 Likes

https://www.instagram.com/p/CF2MKmgly0q/

„270 Park Ave Foundation being reinforced with 16,000 PSI Concrete utilizing Grade 100 Rebar to build a 2 million Squarefoot Superstructure on top.“

https://www.instagram.com/p/CKRV2VNgrqp/

10 Likes

https://www.instagram.com/p/CQx583nnsSQ/?utm_medium=copy_link

10 Likes

So is work on the other half essentially on hold until this half catches up?

1 Like

https://www.instagram.com/p/CQWhw_xnBWJ/
https://www.instagram.com/p/CQO5W4Zjtck/
https://www.instagram.com/p/CQi6oyXnJTA/

14 Likes

https://www.instagram.com/p/CQ4gZQeHQps/

12 Likes

Good grief!

4 Likes

So are they going to keep the renderings for this tower a secret until it’s topped out lol

10 Likes

Seriously. I feel like the public should have a right to know what’s being built, especially for such a huge project. If there’s no legal requirement, there should be.

8 Likes

I believe permits were only issued for the tabletop, which is currently under construction, and will take through the end of the year. Final new building approval will happen sometime between now and then, I should expect we’ll see renderings then.

15 Likes

That’s good. I wonder if they’re still going for the tapered version of the building

2 Likes

Ooooh. I didn’t know that. That explains it. Thanks!

2 Likes

yeahh yeahh!! 2021-07-10
08:15 AM


08:30 AM

08:45 AM

10:45 AM

11:15 AM

11:45 AM

01:00 PM

02:15 PM

03:15 PM

04:45 PM

:sweat_smile:

20 Likes

16 Likes

20210717 → ToDay 20210721

20210717 - 08:15 AM


20210717 - 09:15 AM

20210717 - 12:30 PM

20210717 - 05:00 PM

20210718 - 01:00 PM

20210720 - 07:30 AM

20210720 - 09:45 AM

20210720 - 10:45 AM

20210721 - 08:00 AM

20210721 - 11:15 AM

And last one 02:00 PM Today

:slightly_smiling_face: :sweat_smile: :wink: :+1:

19 Likes

https://www.instagram.com/p/CR-aLmir4r3/

17 Likes

ToDay

20210804 - 12:45 PM


17 Likes

https://www.instagram.com/p/CSHM--9L7nJ/

23 Likes