NEW YORK | 270 Park Ave | 1,389 FT | 70 FLOORS

It’s when a virus like the cornavirus(COVID-19) becomes widespread globally

2 Likes

What the heck is a coronavirus? COVID-19? What the heck is that! How can a beer be a virus. What the heck!

6 Likes

You don’t know what the coronavirus is?? And how can a beer be a virus when I didn’t even mention it??

1 Like

That’s my question. How can a beer be a virus!?!?! Doesn’t make any sense.

3 Likes

Ok first of all its doesn’t make any sense because it’s extremely unlikely for a beer to be a virus.

Btw this is becoming off topic now in this thread

3 Likes

Clearly Yimby is being sarcastic and it’s great.

8 Likes

Ugh, i saw 9 new posts here and I was sure official renderings had dropped. How dare you all just be joking around!

12 Likes

Photo by Tectonic

15 Likes

I want a couple of small pieces of this building’s steel. Depending on what type of steel it is, I could probably take a piece of it to a swordsmith. Anyone else think that a sword made from a skyscraper’s literal bones sounds pretty bad-ass?

12 Likes

That sounds pretty bad ass dude.

3 Likes

I have some pieces of metal from 3 WTC :wink:

6 Likes

That’s pretty cool, how did you get those?

1 Like

I had walked past a few months back before the stay at home orders, I asked a few of the construction guys I saw they said they couldn’t/ they’d get in trouble, and the actual waste containers were inside the site as opposed to on the street as they sometimes are.

2 Likes

Turns out this guy was right about dozens of guys in the basement. They are pouring concrete down today- no idea why

3 Likes

Wonder why they’re pouring concrete down there. The basement levels coincide with East Side Access and when I went on tour, the section of the mezzanine levels that directly connect to 270 Park above was walled off but most everything around it was already finishing up/framing. They said that they will be doing demo since columns, foundations were shifted because of the new building so perhaps this is a part of that work.

2 Likes

Aww, that sucks :frowning: I wonder who is buying the scrap steel? That would be my next inquiry- whoever is buying the stuff might be willing to part with a few small chunks- I don’t think scrap steel goes for that much a pound, but I’d offer a little extra for the labor involved in cutting off a couple of chunks small enough to carry.

1 Like

Trail the dumpsters someday and see where they go…

2 Likes

The steel members are likely NOT in the dumpsters.

Structural steel from this building is probably worth a lot more than the $57/ton steel scrap average since it only 60 years old, in big pieces with basically no impurities.

If this building has ~30K tons of structural steel (guesstimate since I couldn’t find the actual number) then that’s worth at least $2M.

They’re going to keep those pieces segregated.

7 Likes

Grand Central District 1922

From my Book Moses King Kings view of New York 1922

Imgur

on flickr Brady Cloud

12 Likes

Currently being demolished by JPMorgan Chase, 270 Park Avenue, formerly the Union Carbide building, was designed by Gordon Bunshaft and Natalie Griffin de Blois of Skidmore, Owings & Merrill.

Currently being demolished by JPMorgan Chase, 270 Park Avenue, formerly the Union Carbide building, was designed by Gordon Bunshaft and Natalie Griffin de Blois of Skidmore, Owings & Merrill.Credit…Vincent Tullo for The New York Times

A Postcard from the Union Carbide Building 1962

Headquarters for the Union Carbide Corporation, this 52-story skyscraper is the world’s tallest stainless building.

Postcard credit: Manhattan Post Card Pub. Co.

Collection by Mackensen

6 Likes