TKDV
November 13, 2023, 2:17am
4002
From today
All from last Sunday
48th St progress from last Sunday
Someone had mentioned cable’s hanging from the underside of the lower tabletop floor, those are not related to that light installation that was posted a few days back, those are supporting a temporary catwalk
A finished building
29 Likes
SMCYB
November 13, 2023, 8:04pm
4004
Why is there so much cross bracing on these upper floors?
1 Like
TK2000
November 13, 2023, 9:09pm
4005
That’s just the internal bracing for the core. It should become more slim within the next few floors, the core will be flush with the parapet through the very top section when topped out
4 Likes
TKDV
November 13, 2023, 9:38pm
4006
There is bracing on the “core” portion of the steelwork in the 4th tier, but I’m sure SMCYB is refering to the general presence of bracing other than that in the core, which to answer the question is typical of mechanical floors to lessen lateral loads.
6 Likes
stache
November 14, 2023, 2:49pm
4008
First photo interesting it looks black.
1 Like
5Bfilms
November 16, 2023, 1:12am
4009
Real Estate Capital of the World
22 Likes
Per 57th&1st on SSC:
Just now from 57th St (hand-held cellphone camera + binoculars + leaning against a window, so apologies for the not so hot quality…)
Notice the fearless dudes hanging out on the boom of the crane - yikes. Anyone know what they’re doing?
I just saw this while reading the morning news: JPMorgan Plans New Manhattan Headquarters for 15,000 Workers. Source: Bloomberg.
The new building could be as much as 500 feet taller than the current building 270 Park Ave, which is 707 feet (215m)....
9 Likes
JRF
November 16, 2023, 11:11am
4011
could be doing any number of things.
most likely inspection of the sheaves and load line.
they could be changing the main load line configuration (from two parts to one part)
or, more significantly, they could be changing the load line, but i doubt that. not many hours on that crane or its parts.
4 Likes
First pieces of steel for the last two floors of the 4th tier being installed
15 Likes
Really hoping this is topped off by Christmas
3 Likes
That should be the two floors above the conference floors, but what exactly is done there?
—————————
On Zane Hollingsworth | Flickr
16 Likes
TK2000
November 16, 2023, 11:51pm
4016
I still have a feeling Santa will deliver us that present late, but that’s okay. I had Christmas on the last day of January in 2021
2 Likes
JRF
November 17, 2023, 3:17pm
4019
crane is coming down now. should be done by monday or so
8 Likes
TKDV
November 17, 2023, 3:23pm
4020
Those are the 2 conference center floors/the top of the 4th tier.
4 Likes