NEW YORK | 2 World Trade Center | 1,226 FT | 55 FLOORS

Hard to believe there’s a lobby meant to go there as well, a lot of vents/ducts must move I guess.

4 Likes

All of the ducts move, they will just continue vertically to the set of mechanical floors directly above the lobby levels.

8 Likes

@2wtcprogresspics on Instagram

19 Likes

Uploading: 9_11-Memorial-&-Museum_1789574677311.jpg…
FROM WTC EARTH CAM

6 Likes

Absolutely no value in reposting a week+ old photo when its yesterday equivalent is right above.

3 Likes

I tried looking in your post history and it’s quite incredulous to see you commenting that when you add absolutely NO VALUE to this forum. You’re a taker—there’s literally 0 contributions of pictures or updates on any buildings. Every few weeks, you pop in and dictate how others should post.

You spoke about entitlement a few months ago in posts regarding Ken Griffin and fail to see it in yourself. Eat your own drivel. No one owes you anything. We are people, not your personal fetch-bots for updates in the format you want them. And telling a mod how to do their job is a whole other level of silliness.

28 Likes

Will the floors rise as the mechanical equipment is kept in its current place? Furthermore will they be moved above the lobby after construction?

1 Like

Yes, they should continue going up, even as relocation of the HVAC/MEP to the mechanical floors occurs. I’m told that process could take quite some time, so I imagine the building will be rather tall by the time the lobby is finally clear.

3 Likes

Most of the ductwork that was in the footprint of the main core volume has been temporarily relocated (again) so that the core can rise. It’s more likely that they will be relocated to their final location during construction and not after, possibly even after the mechanical floors have been put up. But they will not be waiting until after construction to move them, otherwise the building would still be under construction.

343 Madison is experiencing a similar situation.

3 Likes

yes, to the 7th & 8th floor.

5 Likes

Fence being moved out

17 Likes

They need to finish 45 park place!!!

10 Likes

im saying like

3 Likes

@2wtcprogresspics on Instagram.

15 Likes

Ground level view from @2wtcprogresspics story. The next few months will be so exciting watching this thing start going upward after all these years

17 Likes

Screenshot from EarthCam

10 Likes

18 Likes

More scaffolding wooden planks.

2 Likes

Yes. It’s been stated a few times that it’s necessary