@2wtcprogresspics
As glad as I am to see ANY progress happening on this site after roughly 15 years of inactivity, I think the moment weâll all be excited about is when the first steel beams start to rise up (and its eventual completion after so long)
![]()
Whatâs the likelihood itâll be at least 2-5 stories by the 25th anniversary?
The core will be under construction then, steel starts in Spring 2027
There may be some steel when they start the mechanical podium. Then itâll sit there, at 5-6 stories while they complete the final mech configuration before rising higher.
Vertical construction can continue parallel to mechanical work in the podium

5/18 and 6/23
Thereâs a lot going on here at this construction site
I donât see much new duct work (outside of the large number of ducts that were already on site) besides the 2 stair press ducts that were added. At least in relation to the timelapse that TK2000 shared.
This is the new ductwork since site work started. They installed new fan units where the old ones were and where they accessed the middle of the core on the northern side. They placed the top circle on the new concrete the poured that I pointed out previously
Thanks for pointing that out, I didnât nothing anything north of the 2 bottom highlights.
Those 2 boxes with the circles ontop of them look like heat pumps, that other small duct adjacent to the heat pumps doesnât look connected to anything, but it probably is, the site is just a mess.
The 2 largest ducts that are visible from outside the fence are replacement stair press ducts as I mentioned before. Iâm not sure what that other low lying one next to them is though, it isnât connected to anything.
we are so immature