NEW YORK | 143 Madison Ave | FT | 21 FLOORS

1 Like

March 16th

May 2nd

June 2nd

1 Like

June 24th


2 Likes

Are there any renderings for this project?

Not yet. I haven’t even seen an NB Apication.

Aug 2nd: Demo is complete

2 Likes

Lot is clear and slightly below grade.

9/4

3 Likes

The rendering was posted at the site today, Sep 26th. My camera is muerto.

It’s about 21 floors, as noted above. It’s basically a box, as one might expect for a short building sandwiched between two others. It looks decent though.

3 Likes

4 Likes

Very blah. At least it’s affordable?

I think it’s ok.

Looking down Madison toward the site.

2 Likes

This one is now under construction

11/12

4 Likes

Long line of cement trucks all around the site this morning.

1 Like

12-12

5 Likes

12/13

4 Likes

Jan 10

5 Likes

1/21

Over halfway

5 Likes