@Skyalign Four in a row! ![]()
Yup! And once 589 Fulton Street is complete, we should be able to get it in frame too.
Turned out pretty well. I like the color tone.
looks like a cool place to work.
BH3 Management and Capstone Equities closed on 141 Willoughby Street and have major plans to reposition the vacant office tower in Downtown Brooklyn.
The joint venture acquired the 24-story, 400,000-square-foot building from Savanna through a foreclosure and is now seeking to convert part of the tower into 200 residential units.
The developers plan to add both market-rate and affordable housing with residences spanning studios all the way up to three bedrooms. Only floors two through seven of the 24-story building will consist of office space.
The conversion is expected to start in 2026.
Capstone Equities files plans for 233-unit conversion in DoBro
Can’t access anything else from the article






