JERSEY CITY | Journal Squared (537 Summit Ave) | 730 + 643 + 575 FT | 72 + 61 + 54 FLOORS

From 2.22.20:

15 Likes

Looks like work on the exterior cladding has stopped. No panels have been installed for at least a week.

4 Likes

Some shots from the south. They seem to have resumed cladding, albeit very slowly


15 Likes

I wonder if there was a holdup with the facade company (Covid related or otherwise). From my side there still hasn’t been any facade addition in awhile even as the site continues to run.

From the past few weeks

15 Likes

I don’t think people are going to want to live in buildings like this for a couple of years at least. No balcony and stuck with long elevator commutes etc. This virus will be a major game changer.

1 Like

They recovered from 9/11. They’ll recover from this too.

9 Likes

Today

12 Likes

Today- they are working again to finish up the facade.

15 Likes

Today.

Yesterday:

16 Likes

^^^ If it wasn’t for 1 WTC, this could be any large city. That’s awesome seeing both skylines together.

Not sure how I feel about the facade for the parking area, but overall, it’s shaping up nicely. Really liking the facade facing the PATH parking deck. Taken earlier today

14 Likes


Tec

20 Likes

18 Likes

marvelous photo! props.

3 Likes

From Reddit user EL_Prolifik on the Jersey City subreddit

13 Likes

Yes. JC adds bulk to the lower Manhattan skyline. :+1:

5 Likes

Some pictures from when construction was paused. It restarted last week, although there seemed to be some low level or interior work going on most of the time.

14 Likes

13 Likes

They started cladding on the crown.

17 Likes

They finally started up on the facade again

20 Likes

They look like a miniature 432 Park.

6 Likes