This one now has several hundred piles in place. The street between this site and 351 Marín has been closed off.
It’s going to be amazing towatch two 400-footers rise across a narrow street from each other simultaneously!
This one is definitely moving slower than its neighbor 351 Marin. They are both being constructed by the same GC (AJD) but different owners.
They’ve been digging out the piles for weeks and recently starting pouring some footers. Another crane should be arriving soon (per the PADNA)
From 1/11
Yes. As my roommate described it, the other site (351) is like a professional job, while this one is more like a dude with a backhoe. Still, they seem to have poured the tower foundation finally. There’s a crane pad as well, although its been there for over a month.
That’s a funny way to put it. Reminds me of several of the buildings going up near Newark Ave in the Village. At first I liked to say that it looked like there was just one guy at each site laying CMU’s all day long. But then it became as if all three sites were sharing a single dude laying bricks. One day he’d work at site A, the next day at site B, and so on…
Yesterday.
It’s rising fast now. First floor being built and ready for concrete pouring.
When I walked by an hour later they had already had half of the 2nd floor going up. Sorry didn’t get a pic.
Nice!
A two week series of photos. Both buildings are a couple floors taller now (these are from 2 weeks ago)
The corners are curved, meaning the renderings are correct. It’s just a matter of which type of cladding will be used on this.