JERSEY CITY | 201 Hudson St (Urby II & III) | 736 FT x 2 | 69 FLOORS x 2

10 Likes

looks severely value engineered compared to the first tower. Not going to complain about 2 more 700 footers though.

1 Like

As far as potential timeline, they’re aiming for 2024 for tower 1, and 2026 for tower 2 (so they are aiming for phased construction, despite it being a single phase at the Planning Board).

3 Likes


Just to compare

3 Likes

I like the different shades of grey. Its so cool. I wish it was built on the other side of the water, here in NYC instead :face_with_symbols_over_mouth::face_with_symbols_over_mouth::face_with_symbols_over_mouth::face_with_symbols_over_mouth::face_with_symbols_over_mouth::face_with_symbols_over_mouth:

Construction permits were issued today for the two towers.

17 Likes

Permanently closed sign posted for the surface lot at the site.

21 Likes

Finally!!

Thanks for your contributions to this site!

8 Likes

Absolutely! Happy to have found this community

9 Likes

From reddit. Looks like they either removed or added a sewer line. Preliminary work.

https://www.reddit.com/r/jerseycity/s/T7e7qseLU2

15 Likes