looks severely value engineered compared to the first tower. Not going to complain about 2 more 700 footers though.
As far as potential timeline, they’re aiming for 2024 for tower 1, and 2026 for tower 2 (so they are aiming for phased construction, despite it being a single phase at the Planning Board).
I like the different shades of grey. Its so cool. I wish it was built on the other side of the water, here in NYC instead ![]()
![]()
![]()
![]()
![]()
![]()
Construction permits were issued today for the two towers.
Finally!!
Thanks for your contributions to this site!
Absolutely! Happy to have found this community
From reddit. Looks like they either removed or added a sewer line. Preliminary work.
The entire site is fenced in now. I didn’t see a pile driver on the site yet.
I honestly never thought this would get built, at least as part of Urby as originally intended
Are these buildings going to be an Urby or Sable