Day 2
Earthcam
Day 5
It doesn’t look any different to me. I see a full roof still in place.
They removed a dumpster from the roof?
That too, but like I said, they got rid of tiles on the roof an the small antenna
Oh I see. I had to blow it way up to notice, but the roof texture is quite different. They did get rid of a few layers. That wasn’t clear to me without zooming way in.
Yea, plus they have a few chalk lines layer on the small and big roof, I’m expecting cutting be next week
You have a great eye for detail Thomas. I also didnt notice the difference until i zoomed way in. ( also when you said you saw the concrete pour at 125 greenwich. I was like “what!? I dont see anything”. But sure enough it was true.).
Cheers,
I think The Perelman will actually start earlier!
I found the square footage of all 4 floors!
1st/ground floor: 33,773 SQFT
2nd floor: 32,164 SQFT
3rd floor: 25,921 SQFT
4th floor: 25,921 SQFT
Total: 117,779 SQFT
Hey @rbrome , remember what you said about the exits of the VSC, I found a few plans!
Thanks!
Great finds, Thomas!
Those plans are cool!
It’s such an insanely complicated site… there’s so much going on below grade that fits together like an intricate puzzle. These are just three levels… it goes deeper!
I was trying to figure out where the parking and docks were… it turns out they’re the next two levels down. I found this old (but still roughly accurate) diagram:
Those older plans seem to show “vehicle lifts” between the 1WTC loading docks and street level and/or the PAC. They don’t show the full ramp to the street that’s in the newer plans. I wonder when that was added and why.