The Draft Schedules
Per Jmecklenborg:
I got to tour the East Side Access project on Friday. I was allowed to take my own photos but I had to sign something saying I would not post them online until after the project opens:
Here is a map of the project in the LIRRâs office in Grand Central:
The terminal concourse is built in the old underground yard and has a rectangular shape visible to the public despite the facilityâs random shape. The only vestige of the old curving track is at the transition between the original Grand Central and the new concourse, where a series of staggered piers hint at its original function.
There are also 2-3 pillars a the bottom of the new steps/escalator from Grand Central that are like donk right in the middle and will be a classic example of poorly-placed pillars in the MTAâs many high-traffic pedestrian corridors.
Otherwise, the layout is fantastic. There are four sets of four escalators that align with surface streets since by chance the length of LIRR train cars nearly match the length of NYC city blocks. The northermost and southernmost escalator ânodesâ are offset at a very small angle, maybe 5 degrees, so not exactly parallel.
The top of the nodes also align with the old existing cross-passages beneath Grand Central. This means that the small number of passengers who will transfer from Metro North to LIRR trains wonât have to go up into the main Grand Central concourse.
I was told that the facility was designed with the idea that passengers will come down from the street from one of four sidewalk entrances and pretty much continue in a straight line across the perpendicular concourse to the long elevators down to the train platforms. The hope is that they wonât, typically, travel along the concourse much at all.
The caveat is that there are some LIRR short platforms so there might be some sideways movement down at the platform level as some people shuffle for the part of the train that will access those stations.
Here is a list of factoids I picked upâŚif anyone has more questions Iâll try to answer to them.
-the LIRR has never bought duel-level cars because they canât fit through the 63rd St. Tunnel, despite the fact that is hasnât been used in the 50 years since it was built.
-the station is almost completely ready, with mosaics based on animals of Long Island at the track level, and temporary signage in place. When they do final approval, the stone will be carved to match Grand Central. The track and real-time arrival boards are in place and working - the pranksters in the IT dept put Metro North stations on the demo as a joke.
-There are four tail tracks. Each pair of tracks around each island platform converge into a single tail track that extends approx 1200 feet beyond the station box. I did not get to see the tail tracks.
-Because the LIRR must follow modern FRA regulations in this new facility, they will only be able to stage trains in the trackage between the station box and Sunnyside Yard one-per ventilation block. This contrasts to the existing Penn tubes under the East River, which do not have modern ventilation, and the LIRR has made the habit of stopping them almost immediately behind one-another when there is congestion entering Penn Station.
-there was a huge interruption to the construction of the concourse thanks to the construction of the new JP Morgan bank building on Park Ave. JP Morgan paid huge money to tear up completed work in order to build that buildingâs foundation. Theyâre also getting direct access to the northernmost ânodeâ.
-there are tentative plans to give some older buildings direct entrances to the concourse
-the concourse was built according to 15 year-old plans, and a lot of space was reserved for pay phones. The pay phone notches will instead become automated ticket machines.
-they have built a transit police station, complete with a holding cell.
-the whole thing will be operated by an independent contracted operator, not the LIRR or MTAâŚ
I wonder if that means that there will be a connection between the LIRR concourse and the 47th Street and/or 45th Street passageways for Metro North. Folks heading from Metro North to JFK Airport (likely traveling with luggage) will likely appreciate less walking at Grand Central (though if I recall correctly those northern cross-passages donât have escalators or elevators to Metro North platforms). There will also be Metro North passengers heading to Citi Field, US Open tennis, NY Islanders games and maybe even The Hamptons.
The LIRR does have bi-level cars. Theyâre used on the Port Jefferson, Oyster Bay, Montauk and Greenport subdivisions. Obviously, those cars wonât serve GCT.
Per Jmecklenborg :
Quote:
Originally Posted by mrnyc View Post
"You know what else is crazy? that you did not tell us how you scored this east side access tour â whats the deets on that? "
I know a guy who works for the LIRR. The work elevator was out of service so we had to walk down/up 17 flights of steps (about 8 floors) to the concourse level. There werenât many guys working after hours, just a few guys working on the escalators. The escalators appear to be almost ready but we werenât able to walk down/up them, we had to use the concrete steps.
We were told that they are already testing trains but we didnât see anything happening on the tracks. They are planning to get some new electric work locomotives but donât have them yet. The ventilation system is so powerful that theyâll be able to use diesel work locomotives if they need to.
I forgot to mention that there are four circular vent intakes in each station box, aligned with the cross-paths which are aligned with the escalators down from the same concourse. Itâs all built to be able to keep people safe in the event of a major fire, but itâs pretty clever how they were able to use them as an architectural feature.
I also forgot to mention that he doesnât believe that theyâll use all four elevator banks when they open. He thinks that they wonât turn on the one nearest to the new JP Morgan tower until that tower is occupied. That tower is going to have 12,000+ workers.
Donât know why I put this in general when itâs directly related to this project
Thereâs a great documentary about Kusama.
A delay until next year?
Ah, shoot, here we go again
Only a few months more.