NEW YORK | 56 Leonard St | 821 FT | 57 FLOORS

Greenwich by Fenzo, on Flickr

8 Likes

https://twitter.com/trdny?s=09


TECTONIC

10 Likes

Great photo, tec

Glass now installed on almost all of eastern facade facing Church Street. Scaffold is down on Leonard Street side and work is proceeding on window mullions and front sidewalk. I’m guessing work will be far enough along by this spring to install the bean.

8 Likes

https://instagram.com/p/BQRPfnThb2G/
@jazzyli_nyc

14 Likes

febwalk17-13 by bslax28, on Flickr

10 Likes

Dario.nyc
https://www.instagram.com/p/BQz_AdajtVw/
Beautiful Tribeca

10 Likes

https://www.instagram.com/p/BQ9TQ-DBchk/
@peteralessandria

14 Likes

Cool!

Pramuc
https://www.instagram.com/p/BREFexojYC2/

6 Likes

Shed coming down…


TECTONIC

11 Likes

Routing Church Street pedestrians through a passage in the building also has stopped. They are beginning to finish off the exterior of that side of the first floor and prepare for the bean’s installation in the not too distant future.

2 Likes

Here are some images of the ground floor. First is a view from Leonard of the bean area.

This is a view of the bean area from Church.

Finally this a view from Church of the ground floor. The shape of the future exterior glass facade is visible on the cement ceiling.

11 Likes

Nice photos, Chused


TECTONIC

10 Likes

Progress slow but sure. The front entrance facade and lobby are complete.

Most of the glass has been installed around the corner of Church and Leonard.

And the old sidewalk along Church has been chopped up and cleanup work is proceeding in the bean area.

9 Likes


TECTONIC

9 Likes

Does anyone have a timeline on the bean installation?

1 Like

Not exactly. But I walked by there this afternoon. They are now waterproofing that corner of the ground floor where the bean will go. The glass in that area is in, but the solid wall surfaces around the bean are being waterproofed to prepare for installation of the exterior finish. The area abutting Church Street where the new sidewalk, curb and eastern lane of the street will be constructed also is being worked on. So the bean can’t go in until the ground floor area is water proofed, a new base surface is poured, the public sidewalk and street is built, and the exterior wall behind the bean area is complete. They have not been working quickly or with a large crew so I don’t think all of this will happen at warp speed. At least several more weeks are needed, probably more.

6 Likes