NEW YORK | 175 Park Avenue (Grand Hyatt) | ~1,646 FT | 95 FLOORS

Hallo

Yes, me too, how are you?

2 Likes

Yeah it would be just like posting a headline from the Catholic Business Journal about Rick Caruso or the DeBartolos. Not something we’re used to seeing posted here, but perfectly normal if you know what the source is. Now if it was a headline from like, Jewish Globalist Blood Libel Conspiracy News or something, that would be problematic :joy:

5 Likes

It’s a Jewish publication. I don’t see the issue. I posted it because it’s more news about the tower.

8 Likes

I hope for more towers

Not only 175 Park Ave and 350 Park Ave

2 Likes

News is news but what’s that news in particular though in regard to that post? It’s always been known that TF Cornerstone was co-developing the site with RXR.

Putting that aside, I don’t understand why nobody can get the completion date the same or right. People/sources have been reporting all sorts of completion dates, which leads to and sounds like hesitancy.

3 Likes

So where are we?

We don’t know when the existing building will be demolished.

We don’t know when the new building will be completed.

We don’t know the height of the new building.

We don’t know if they have an anchor tenant.

The only thing we know for sure is the religious inclination of the developer lol.

13 Likes

There was an anchor, but that’s not the case for a few months now. @HappyCapSlapper mentioned struggles/delays to secure financing for demo+foundation (which is the reason).

Regardless, they seem optimistic given they filed permits for demo.

2 Likes

Assuming that the anchor was Societe Generale, I wonder if they’ll just stay at their current site unless BP can sign them at 3 HY. It seems that the towers that Extell plans on Park and that SLG plans on Madison would have floor plates that are too small.

Hopefully, Blackstone will be the anchor. The timing works out perfectly. Also, Blackstone’s desire to remain on Park is unrealistic. Extell’s new tower couldn’t accommodate them. Maybe they can lease 700,000 sf at 175 Park and 300,000 sf at Extell’s new tower.

I can’t imagine them staying at 345 Park. That tower is really dated.

4 Likes

I’m still holding out hope its Burger King.

2 Likes


https://www.instagram.com/p/Db_JOyhmneP/

3 Likes

What is the second tallest?! It isnt 350 Park!

4 Likes

Shocker, AI slop instagram post has AI slop information.

10 Likes

If RXR was able to find the requisite funding, it’s entirely plausible that the original tenant is back on board. I highly doubt that they found alternative arrangements in a matter of months. Also, if it is SG, and they needed extra time, I cannot imagine that SLG wouldn’t extent their existing lease by a year or two.

3 Likes

SocGen needs to either renew their current lease for multiple years, or get into a development that will be complete by 2032, which PENN15 or 3HB can be.

Earlier this year it was understood that due the delays, this tower can no longer be completed in time…

It can be completed by 2033 and accomodate Blackstone whose current lease is until 2034? Last year I speculated that Blackstone is the tenant they had on board - which it wasn’t. So, everything’s possible…

2 Likes

I can’t imagine that for purposes of goodwill, SLG would not be flexible and extend SG’s lease for 1 to 2 years. There aren’t a lot of major commercial landlords in NYC, and there’s a value to maintaining good will. SLG could easily need an accommodation from a fellow landlord when it seeks to fill 346 Madison. Further, I highly doubt that tenants will be banging down SLG’s door for this space. Let’s be frank: 245 Park is a lousy building.

4 Likes

1646 feet would be the city’s tallest building roof, not the third-tallest. Central Park Tower is the current highest roof at 1550 feet.

7 Likes

Finally build this tower

3 Likes

From my 3d model:

23 Likes
3 Likes