JERSEY CITY | 50 Hudson St | 476 FT | 40 FLOORS

Hard to see, but this is now under construction with rebar being retrofitted into the existing concrete decking.

21 Likes

Tower crane was assembled this week (picture from Sat Nov 15)

28 Likes

Fencing was being put up yesterday across from the ferry terminal - looks like they are getting ready to take down the barrier to the parking lot. Site was very active and crane was in use

17 Likes
9 Likes

22 Likes

I just noticed that it looks like after at least a few years that the top LED strip of 4 WTC is now fixed and back on.

6 Likes

You’re correct. But give it a year, I’m sure an entire strip will be blown out then

4 Likes

Quite a lot of activity today - concrete actively being poured

25 Likes




17 Likes

Photos from 1/30/26

21 Likes

20 Likes

24 Likes

Another two floors up today.

22 Likes

Incredible how fast this building is going up!

21 Likes

This one is going to make a big visual impact right outside the PATH station

19 Likes




20 Likes

16 Likes

\

20 Likes

17 Likes

Taken this afternoon. Moving quickly! So nice to see another parking lot bite the dust.

19 Likes