TORONTO l CIBC Square (45 Bay St) l 798 + 780 FT l 54 + 49 FLOORS

Office towers. Shoring is currently underway.

11 Likes

This one is looking great so far! Definitely the best office tower going up in Toronto.

From 2 days ago

8 Likes
5 Likes

CN Tower Earth Day Lighting and CIBC SQUARE, image by “Urban Toronto” Forum contributor Razz

3 Likes
4 Likes

Phase 2 (northern tower at 141 Bay Street) will begin construction soon, as the bus terminal on the site has closed.

3 Likes

Really nice. Getting Norman Foster vibes.

1 Like

Phase TWO under construction

Pics by me Mulan M.

5 Likes

The old Building on this pic is the Toronto Flatiron Building

Pics by Mulan M.

10 Likes

These are my last updates from Canada today, and I can say there is a lot of building going on. The boom is enormous.

Pics by me Mulan M.

9 Likes

As my tour guide said about Toronto last September:
Toronto is a young city that still has its future ahead of it.



Pics by hawc / UrbanToronto

SkyscraperPage Forum - View Single Post - TORONTO | Highrise Developments Compilation Thread

8 Likes

Imgur

On Josh Kennington Photographics | Flickr

7 Likes

Hello, the following are my images from three days ago, the 2nd phase is really getting up there now. (I’m a local, heck that image above is mine :slight_smile: )




13 Likes

Thank you for your updates on Toronto. :+1:
I was thrilled last year by this city that still has its future ahead of it.

3 Likes



7 Likes

From Sept 1st:
Late August
Late August
Late August

7 Likes


https://urbantoronto.ca/forum/attachments/20240926_175415-jpeg.599666/

Credit: https://skyscraperpage.com/forum/showpost.php?p=10293069&postcount=561

8 Likes

Imgur

On Geo Swan | Flickr

8 Likes

Toronto is starting to look like a mix of America and Asia - I think the new buildings are not shy of being more expressive than their counterparts here

4 Likes