Work has started on the bricks via King Contracting Company’s Instagram stories
https://www.instagram.com/p/CcqCZRkOQMI/?igshid=NjY2NjE5MzQ=
7 Likes
https://www.instagram.com/p/CdN3QTiL8of/?igshid=YmMyMTA2M2Y=
https://www.instagram.com/p/CdiWCXPuCtP/?igshid=YmMyMTA2M2Y=
3 Likes
Nice. There will be another tower built adjacent to this one in “phase 2”.
2 Likes
Halfway up?
what? this is topped off. lol
Yes, I can see that. I was talking about the facade. Or whatever they’re doing rn
Looks to be about it. They are almost done with the facade on the shortest part of the building.
1 Like
2 Likes
They are anticipating completion of the brick facade by the end of August.
1 Like
When does phase 2 begin?