# SAN FRANCISCO | 201 Mission Street (Block 5) | 550 FT | FLOORS

**URL:** <https://forum.newyorkyimby.com/t/san-francisco-201-mission-street-block-5-550-ft-floors/979>\
**Category:** Under Construction\
**Created:** [September 13, 2014, 2:39am UTC](https://forum.newyorkyimby.com/t/san-francisco-201-mission-street-block-5-550-ft-floors/979 "2014-09-13T02:39:54Z")\
**Posts on this page:** 6\
**Page:** 1

<div class="post-metadata">

**Author:** ![chris08876](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/chris08876/32/1617_2.png) [@chris08876](https://forum.newyorkyimby.com/u/chris08876)\
**Post date:** [September 13, 2014, 2:39am UTC](https://forum.newyorkyimby.com/t/san-francisco-201-mission-street-block-5-550-ft-floors/979/1 "2014-09-13T02:39:54Z")

</div>

**Renderings:**

[](https://imgur.com/AsWP8Fi)  
[](https://imgur.com/iSOukUb)  
[](https://imgur.com/ewrFWo5)  
[](https://imgur.com/eXqNpya)  
[](https://imgur.com/eXqNpya)

> **Proposed Project:**

> • $172.5Million Purchase Price (land proceeds pledged to the TJPA for  
> construction of the Transit Center)  
> • Approximately 665,000 rentable square feet of office space in a  
> 550-foot-tall tower ;  
> • Approximately 15,000 square feet of publicly accessible ground floor  
> open space;  
> • An underground parking facility with 117 parking spaces in  
> mechanical stackers;  
> • Streetscape improvements including the extension of a portion of  
> Natoma Street;  
> • Ground-floor retail space of approximately 5,700 square feet; and,  
> • A minimum LEED Gold level of certification for sustainability.

> **Next Steps and Schedule:**

> • September 12, 2014 – Commission to consider approval  
> of Exclusive Negotiation Agreement (“ENA”)  
> • October 2014 – Commission Workshop on Revised  
> Concept Designs  
> • March 2015 – Approval of DDA and Schematic Designs  
> • April 2015 – Payment of non-refundable $2,000,000  
> DDA Deposit (to be credited against purchase price)  
> • September 2015 – Close of escrow and payment of  
> purchase price  
> • April 2016 – Construction commencement  
> • May 2019 – Construction completed (outside date)

**Reference:**

1. PDF: [http://transbaycenter.org/uploads/2014/09/Transbay-Block-5-TJPA-Presentation.pdf](http://transbaycenter.org/uploads/2014/09/Transbay-Block-5-TJPA-Presentation.pdf)

---

<div class="post-metadata">

**Author:** ![MrVenaCava](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/mrvenacava/32/1526_2.png) [@MrVenaCava](https://forum.newyorkyimby.com/u/MrVenaCava)\
**Post date:** [September 13, 2014, 3:20am UTC](https://forum.newyorkyimby.com/t/san-francisco-201-mission-street-block-5-550-ft-floors/979/2 "2014-09-13T03:20:07Z")

</div>

Very cool building!

---

<div class="post-metadata">

**Author:** ![JC\_Heights](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/jc_heights/32/90668_2.png) [@JC\_Heights](https://forum.newyorkyimby.com/u/JC_Heights)\
**Post date:** [August 28, 2017, 2:27am UTC](https://forum.newyorkyimby.com/t/san-francisco-201-mission-street-block-5-550-ft-floors/979/3 "2017-08-28T02:27:46Z")

</div>

Block 5 is also under construction and looks better now with this new updated design.

> **[A.CRE - Real Estate Financial Modeling, Careers, and Education](https://www.adventuresincre.com/)**
>
> Online resource for real estate professionals. Includes real estate financial models, career advice, CRE education insights, and networking opportunities.

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/d/0/d08d78b49f8fec3ccee2bdf4b302824342adce8e.jpg) ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/3/1/313fdd04cb6655dd1e3f73d65ab9ad7699cf5aa7.png) ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/b/9/b9c66f2a9758a75e98c319a6fcd4b7ee86effc73.jpg) ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/d/9/d92c37ed6a459ff6de1be9671bad02fb657d7615.jpg) ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/3/7/3732e00560487a10f8f1b088082dcda1b39d8218.jpg) ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/0/7/07c0a195e00a17d7c5a643d474004b58aeaf7de5.jpg)

Looks like most of the podium is up already…

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/6/c/6c21e971510df733424fc278bd35752a486e668a.jpeg)

---

<div class="post-metadata">

**Author:** ![JC\_Heights](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/jc_heights/32/90668_2.png) [@JC\_Heights](https://forum.newyorkyimby.com/u/JC_Heights)\
**Post date:** [October 29, 2017, 4:30pm UTC](https://forum.newyorkyimby.com/t/san-francisco-201-mission-street-block-5-550-ft-floors/979/4 "2017-10-29T16:30:26Z")

</div>

Last week

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/9/4/94e28d0f38501a52c57117a03615f9a5ed622710.jpeg) ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/c/d/cdfbb4833f90ae019d48c647bdb8be0c191c298b.jpeg) ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/b/c/bceedf5f178a06b5834e810b2727f9639cef634a.jpeg) ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/3/3/33a73903b022fc0b5136d7853487ccd50d749f55.jpeg)t

---

<div class="post-metadata">

**Author:** ![robertitoam](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/robertitoam/32/4411_2.png) [@robertitoam](https://forum.newyorkyimby.com/u/robertitoam)\
**Post date:** [November 3, 2017, 11:43pm UTC](https://forum.newyorkyimby.com/t/san-francisco-201-mission-street-block-5-550-ft-floors/979/5 "2017-11-03T23:43:51Z")

</div>

With all the development currently going on in San Francisco the city is almost turning into some sort of science fiction fever dream.  
I’m loving it

---

<div class="post-metadata">

**Author:** ![JC\_Heights](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/jc_heights/32/90668_2.png) [@JC\_Heights](https://forum.newyorkyimby.com/u/JC_Heights)\
**Post date:** [February 17, 2018, 3:03am UTC](https://forum.newyorkyimby.com/t/san-francisco-201-mission-street-block-5-550-ft-floors/979/6 "2018-02-17T03:03:03Z")

</div>

From a few days ago

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/8/c/8cea82ecf42d5530c0530c73a1fe72d9b153d567.jpeg) ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/2/8/28356df62f3ed2cbd5815ae333f0bade18a6a4ac.jpeg)
