# NEW HAVEN, CT. | 52-66 State St (Coliseum Redev.) | FT | FLOORS

**URL:** <https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354>\
**Category:** Under Construction\
**Created:** [December 26, 2014, 5:52pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354 "2014-12-26T17:52:49Z")\
**Posts on this page:** 12\
**Page:** 1

<div class="post-metadata">

**Author:** ![MrVenaCava](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/mrvenacava/32/1526_2.png) [@MrVenaCava](https://forum.newyorkyimby.com/u/MrVenaCava)\
**Post date:** [December 26, 2014, 5:52pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/1 "2014-12-26T17:52:49Z")

</div>

## [New Haven Gets Critical State Funding For Coliseum Redevelopment][1]

By Kenneth R. Gosselin Oct 30 2014

 ![](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/0/7/07f86f94062f5dbd747927f8a504755345f350a8.jpeg)

> Construction at the site of the former New Haven Coliseum — envisioned since the venue was demolished in 2007 — could get underway next summer now that critical state funding has been earmarked for road and other improvements.

> Gov. Dannel P. Malloy announced Thursday that the $400 million project is slated to receive $21.5 million in state bond money — a boost for a project that will complement other economic development in the city and create new jobs.

> Plans for the Coliseum property are part of a larger vision to stitch back together New Haven’s downtown, divided in the 1960s by the Route 34 connector, which was never finished.

> The Coliseum development — a piece of the larger Downtown Crossing — is expected to include hundreds of apartments, a hotel, shops, restaurants and office space.

> “The Coliseum site redevelopment is a vital component of the Downtown Crossing project and is a once in a generation opportunity to rebuild 5.5 acres of prime land in the heart of New Haven,” Malloy said.

> The state funding, which still needs State Bond Commission approval, would be used to reconnect South Orange Street across Route 34 toward Union Station, establishing a connection between downtown and the train station, the Hill neighborhood and the medical district.

> The state’s investment is being matched by $12 million from the city.

> The developer, Montreal-based LiveWorkLearnPlay, would begin with a public square flanked by 380 mixed-income apartments; 35,000 square feet of retail space, enough for two dozen shops and restaurants; and 5,000 square feet of space for seasonal incubator businesses.

> In addition, plans call for a 190-room, 4 or 41/2 -star hotel with a conference center, a fitness and wellness center, and a spa. Between 100 and 200 upscale residential units — some of them condominiums — would be connected to the hotel to give tenants and owners access to the amenities of the hotel.

> Initially, the mixed-income housing and retail components were expected to be ready in the summer of 2016 — with the hotel and upscale residences to be finished in 2017 or 2018.

> But, as a condition of getting the state funding, Malloy pushed for the construction of the hotel earlier, arguing that the hotel would drive job creation. It also would provide much-needed lodging space for the city, particularly for visitors brought in by the new, $100 million headquarters of Alexion Pharmaceuticals now under construction nearby.

> “It was very much part of the governor’s point of view that the benefit to the people of Connecticut was going to be on the economic development side,” Matthew Nemerson, New Haven’s economic development administrator, said. “Alexion changes our profile now. He wanted the focus on that now in return for this money.”

> Moving up construction of the hotel meant dealing sooner with major utility lines — electricity, gas, water and sewer — that run through the area where the hotel and an underground parking garage would be constructed. Those lines must be relocated sooner than expected, meaning an earlier construction timetable starting this year had to be scrapped.

> Max Reim, LWLP’s co-managing partner and founding principal, said he believes the housing and hotel can be ready late in 2016, even if construction doesn’t get underway until mid-2015, an admittedly aggressive timetable.

> “There’s nothing that makes us think the timing won’t work,” Reim said.

> Reim said construction had to be pushed back considering “the complex series of dynamics” involving the state, the city and the utility companies.

> “Overall, the extra time that we took will only benefit the community and the project,” Reim said, praising LWLP’s partnering with the city and the state.

> The majority of financing for the project will come from private investors and real estate trusts. Reim said that financing has been lined up but now must be finalized.

> Reim said LWLP is close to deciding which name the hotel will carry.

> Future phases of the Coliseum redevelopment are expected to include a residential tower of 500 or more units and office space encompassing 200,000 square feet, preferably with a single corporate tenant.

 ![](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/8/0/80c0efbc4f9e52f2e3ec7fb73336e34150fd43e2.jpeg)  
.  
 ![](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/f/7/f77198b25eeeecc6c1b36fe9e9a3b77e9ba12081.jpeg)  
[1]: [New Haven Gets Critical State Funding For Coliseum Redevelopment – Hartford Courant](http://www.courant.com/business/hc-new-haven-coliseum-connecticut-state-funding-20141030-story.html)

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [February 19, 2022, 8:45pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/2 "2022-02-19T20:45:38Z")

</div>

> **[Work Set To Begin At Former Coliseum Site](https://www.newhavenindependent.org/article/former_coliseum_project_update)**
>
> With the long-delayed redevelopment of the former Coliseum tentatively set to begin this coming spring, the developer clued local contractors about how to seek a piece of the work. …

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [July 29, 2022, 1:33pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/3 "2022-07-29T13:33:07Z")

</div>

The redevelopment of the coliseum site has been delayed. It’s still a parking lot for now.

NH Independent photo:

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/2/6/26f5a33d2895e2a07fa0d9a5d5d4ffb34760650e.jpeg)

> **[Amid Boom, 4 Building Projects Hit Delays](https://www.newhavenindependent.org/article/stalled_downtown_developments)**
>
> Three different developers promised to build over 460 apartments and 132 hotel rooms across four different city-approved projects downtown amid a building boom. Years later, those projects remain unbuilt -- and the lots they're slated…

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [January 19, 2023, 3:44pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/4 "2023-01-19T15:44:53Z")

</div>

Construction at former New Haven Coliseum site

> **[Coliseum Site Construction Now Underway](https://www.newhavenindependent.org/article/coliseum_3)**
>
> Dirt was on the move -- and not just in a ceremonial fashion -- at a now-bustling construction site that once housed the long-gone Coliseum. …

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/e/9/e98c1a41d7a4861c4d852bd8b71019e2d74f934d.jpeg)

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/0/d/0deb00ae608372c60719754d075cbb5d47cffe8c.jpeg)  
lab building

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/3/9/399fbeb52a242cefef57566a697af62fff8fee36.jpeg)  
residential

---

<div class="post-metadata">

**Author:** ![mtoltethys](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/mtoltethys/32/30087_2.png) [@mtoltethys](https://forum.newyorkyimby.com/u/mtoltethys)\
**Post date:** [January 20, 2023, 12:33am UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/5 "2023-01-20T00:33:15Z")

</div>

Something this area needs. Union station feels so separated from the rest of the city because of these lots, good to see them being filled

---

<div class="post-metadata">

**Author:** ![CT\_Citizen](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/ct_citizen/32/147701_2.png) [@CT\_Citizen](https://forum.newyorkyimby.com/u/CT_Citizen)\
**Post date:** [July 25, 2023, 1:47am UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/6 "2023-07-25T01:47:03Z")

</div>

I found this photo online from a few days ago

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/1/5/15ec38df310c190ce3ac40bffe0f628d52475f72.jpeg)

---

<div class="post-metadata">

**Author:** ![CT\_Citizen](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/ct_citizen/32/147701_2.png) [@CT\_Citizen](https://forum.newyorkyimby.com/u/CT_Citizen)\
**Post date:** [January 3, 2024, 11:37pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/7 "2024-01-03T23:37:02Z")

</div>

Phase 1B and 1C has started construction

> **[Redevelopment of former New Haven Coliseum site into life sciences/tech...](https://www.hartfordbusiness.com/article/redevelopment-of-former-new-haven-coliseum-site-into-life-sciencestech-building-gets-boost)**
>
> City and state officials on Wednesday are kicking off the next phase of the mixed-use Square 10 redevelopment project, which will bring a new 277,400-square-foot life sciences and tech office building to the site of the former New Haven Veterans...

 ![IMG_8261](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/7/c/7cf450c8c6e061a683ff236b9bf40f157338f800.jpeg)  
 ![IMG_8262](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/5/4/54687c3fddb6ed61468c516eba1e6e242b455a50.jpeg)

Phase 1A

 ![IMG_8260](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/3/5/352e769cdf244d0455466f619af234559da1ad51.jpeg) (credit to the patch)

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [September 9, 2024, 5:15pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/8 "2024-09-09T17:15:41Z")

</div>

Square 10 will be getting a grocery store (Elm City Market).

> **[Elm City Market To Leave 360 State](https://www.newhavenindependent.org/article/elm_city_market)**
>
> (Updated) A downtown grocery store that has anchored a luxury apartment complex at Chapel and State streets for more than a decade will be closing up shop…

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [December 20, 2024, 3:33pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/9 "2024-12-20T15:33:02Z")

</div>

> **[Phase 1A Of New Haven Veterans Memorial Coliseum Redevelopment Done](https://patch.com/connecticut/newhaven/phase-1a-new-haven-veterans-memorial-coliseum-redevelopment-done)**
>
> ​Phase 1A: a 200-unit residential building, 16K sf of retail space, 25K sq of public open space, and a public plaza along a retail laneway.

> **[At Long Last, Ex-Coliseum Apartments Open](https://www.newhavenindependent.org/article/coliseum_5)**
>
> Brian Alves reached back in time to his teenage years attending concerts by Aerosmith and Huey Lewis and the News at the Coliseum -- as he gave reporters…

275 South Orange Street - New Haven Independent photos

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/f/5/f574a30e6af4ad27fe227521b7a0c2b0b6aa9db6.jpeg)

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/d/a/da09085939740c08e6770ef26605ba17ffdf6597.jpeg)

---

<div class="post-metadata">

**Author:** ![HerrDavid](https://avatars.discourse-cdn.com/v4/letter/h/f07891/32.png) [@HerrDavid](https://forum.newyorkyimby.com/u/HerrDavid)\
**Post date:** [December 20, 2024, 11:41pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/10 "2024-12-20T23:41:34Z")

</div>

This will take some getting used to, but better than an empty lot. And I’m all for stitching downtown and Union Station back together.

Still, I miss the Coliseum, even if it’s just for sentimental reasons.

---

<div class="post-metadata">

**Author:** ![CT\_Citizen](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/ct_citizen/32/147701_2.png) [@CT\_Citizen](https://forum.newyorkyimby.com/u/CT_Citizen)\
**Post date:** [April 11, 2025, 7:04pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/11 "2025-04-11T19:04:20Z")

</div>

> **[Pedestrian Ramp Pitched. Plus, Quantum!](https://www.newhavenindependent.org/article/pedestrian_ramp_quantum_hub_proposed_for_downtown_crossing)**
>
> The highway exit separating Downtown from the Hill could someday sprout an arc-shaped pedestrian ramp in the middle of nine lanes of traffic. The city…

 ![IMG_5186](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/4/f/4f0fb0e3ab0349bd08620e97c4493f88808adf0d.jpeg)

---

<div class="post-metadata">

**Author:** ![CT\_Citizen](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/ct_citizen/32/147701_2.png) [@CT\_Citizen](https://forum.newyorkyimby.com/u/CT_Citizen)\
**Post date:** [April 23, 2025, 12:21am UTC](https://forum.newyorkyimby.com/t/new-haven-ct-52-66-state-st-coliseum-redev-ft-floors/1354/12 "2025-04-23T00:21:21Z")

</div>

> **[NIH Cuts Put Bio Tower At Risk](https://www.newhavenindependent.org/article/nih_uncertainty_leaves_bioscience_development_in_limbo)**
>
> The site of New Haven's next planned biosciences office and lab tower will remain an empty lot for now -- as Yale pulls back its biotech investments in…
