# NEW HAVEN, CT. | 100 College St | FT | 13 FLOORS

**URL:** <https://forum.newyorkyimby.com/t/new-haven-ct-100-college-st-ft-13-floors/1355>\
**Category:** Completed\
**Created:** [December 26, 2014, 6:03pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-100-college-st-ft-13-floors/1355 "2014-12-26T18:03:42Z")\
**Posts on this page:** 9\
**Page:** 1

<div class="post-metadata">

**Author:** ![MrVenaCava](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/mrvenacava/32/1526_2.png) [@MrVenaCava](https://forum.newyorkyimby.com/u/MrVenaCava)\
**Post date:** [December 26, 2014, 6:03pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-100-college-st-ft-13-floors/1355/1 "2014-12-26T18:03:42Z")

</div>

## [New Haven’s Downtown Crossing project moves forward](http://www.nhregister.com/20130814/new-havens-downtown-crossing-project-moves-forward/1)

By Joe Amarante  
08/14/13, 12:00 AM EDT

> **[About City of New Haven, CT](https://cityofnewhaven.com/)**
>
> Use this website for informational purposes only.The City of New Haven, located in New Haven County, Connecticut, is one of the state’s oldest and most historically significant communities. This website is an independent, non-official informational...

> NEW HAVEN \>\> From the balcony vantage point of the Air Rights Garage Wednesday, city officials gave a quick visual update of the Downtown Crossing project as two construction companies worked to prepare its signature building’s base and access points.

> Large U-shaped, concrete pieces of culverts that will allow vehicle access under the new 100 College Street building and parking garage were being set in place adjacent to the present College Street bridge. As the mayor talked to a reporter, another piece arrived by truck on South Frontage Road from Avon.

> “They’re going to build the two culverts, cover them with dirt, pave them and then tear down the old bridge,” DeStefano said, “and today was the first day we started to (put in place) the culverts.”

> The mayor, who decided not to run for another term after 20 years in office, said the culverts will allow traffic headed for the Air Rights Garage to go through the new structures and “all the way down to the hospital complex. Work is being finished on Martin Luther King Boulevard (the old North Frontage Road). The next thing drivers will see is the closing of Exit 2, which will occur in about November of this year.”

> The work Wednesday involved dirt-moving, a crane at the ready for the culvert sections, with drainage pipes lined up for placement soon, as traffic moved steadily on the north and south sides of the work. C.J. Fucci Construction is doing road work to turn the Route 34 highway into urban boulevards that reconnect neighborhoods separated by what some have called the “highway to nowhere.”

> At the Church Street exit from the curtailed highway, there will be five lanes, a right and left turn lane and three travel lanes heading north, the mayor said.

> Payloaders from John Moriarty & Associates moved dirt in the area where the foundation will be poured for Alexion Pharmaceuticals’ research headquarters. DeStefano noted the Alexion building was recently increased in scope from 11 floors to 13 as the company added 75,000 square feet to plans. Its construction will begin later this year and last until 2015.

> “That’ll be 1,000 permanent jobs,” he said. “Now, before that is done, all the road work around the project will be completed.”

> […]

June 4 2014  
[smackfu](http://www.city-data.com/forum/35086869-post220.html)

 ![](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/e/7/e7834dafa6876356881627c186e88ee130402ec5.jpeg)

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [May 22, 2020, 9:42pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-100-college-st-ft-13-floors/1355/2 "2020-05-22T21:42:19Z")

</div>

Complete

Google Streetview

 ![100 College Street](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/0/9/098a52cf888643155fec5d2101d6386be6905965.jpeg)

https://www.google.com/maps/embed?pb=%213m2%212sen%214v0%216m8%211m7%211slBMxkkSI0s2W5sOBwda7og%212m2%211d41.3038229%212d-72.9312742%213f324.53%214f12.323%215f0.75

---

<div class="post-metadata">

**Author:** ![YIMHudson](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/yimhudson/32/2304_2.png) [@YIMHudson](https://forum.newyorkyimby.com/u/YIMHudson)\
**Post date:** [July 10, 2021, 11:46pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-100-college-st-ft-13-floors/1355/3 "2021-07-10T23:46:17Z")

</div>

> **[CT developers secure $180M construction loan for new life science facility |...](https://rew-online.com/ct-developers-secure-180m-construction-loan-for-new-life-science-facility/)**
>
> Harrison Street and Winstanley Enterprises are developing the property.

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [April 26, 2022, 7:41pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-100-college-st-ft-13-floors/1355/4 "2022-04-26T19:41:58Z")

</div>

![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/4/3/436f0a4d46abb00b8d842bb57dcb72667a1ce1e1.jpeg)  
Construction underway at 101 College St., right next to the existing Alexion bioscience building at 100 College. ( NH Independent )

> **[Building Permit Budget $ On The Rise](https://www.newhavenindependent.org/article/building_dept_budget)**
>
> The Elicker Administration expects a $1.3 million bump in building permit revenue next fiscal year, as city inspectors take on complex -- and costly -- new buildings like the in-the-works 10-story bioscience tower at 101 College St. …

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [August 5, 2022, 1:41pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-100-college-st-ft-13-floors/1355/5 "2022-08-05T13:41:20Z")

</div>

Construction at 101 College Street - NH Independent photos

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/1/d/1d6044e01cc9b2c2d4242f8ae2f141991259f860.jpeg)

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/5/c/5c42ed9b1a77020af03586ef6e63249c84ea87ec.jpeg)

> **[Biotech Beams, Dreams Rise On College St.](https://www.newhavenindependent.org/article/a_year_later_biotower_is_the_steel_deal)**
>
> A new bioscience tower has begun taking shape, and a vision of New Haven’s jobs future along with it. …

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [September 21, 2023, 2:51pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-100-college-st-ft-13-floors/1355/6 "2023-09-21T14:51:58Z")

</div>

> **[BioCT plans to move into new 101 College building in New Haven](https://www.hartfordbusiness.com/article/bioct-plans-to-move-into-new-101-college-building-in-new-haven)**
>
> BioCT, which serves as the voice for Connecticut’s bioscience industry, announced this week it plans to move into the new 101 College St. building in New Haven by February.
> 
> Jodie Gillon, president and CEO of BioCT, said the building appealed to the...

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [December 11, 2023, 2:47pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-100-college-st-ft-13-floors/1355/7 "2023-12-11T14:47:45Z")

</div>

> **[New Haven’s 101 College St. bioscience tower nears debut, as demand for lab...](https://www.hartfordbusiness.com/article/new-havens-101-college-st-bioscience-tower-nears-debut-as-demand-for-lab-space-slows)**
>
> The 101 College St. building in the heart of New Haven is set to debut in early 2024, providing new research and laboratory space for the city’s growth-minded bioscience industry.
> 
> Two-year-old construction on the 525,000-square-foot life sciences...

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/c/6/c63ce96fbd5821ad4feaf263198669d300de0f0d.jpeg)  
HBJ PHOTO | STEVE LASCHEVER  
Carter Winstanley is the lead developer of the 101 College St. bioscience tower in New Haven that is set to debut early next year. In the background is 100 College St., another New Haven bioscience tower that Winstanley’s firm developed.

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [September 9, 2024, 5:14pm UTC](https://forum.newyorkyimby.com/t/new-haven-ct-100-college-st-ft-13-floors/1355/8 "2024-09-09T17:14:45Z")

</div>

> **[Biopharma Biz Pays $41M To Not Move](https://www.newhavenindependent.org/article/arvinas_101_college)**
>
> One of New Haven's biggest biopharma success stories won't be moving into 160,000 square feet of brand new office and lab space at the 101 College St.…

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [August 12, 2025, 11:26am UTC](https://forum.newyorkyimby.com/t/new-haven-ct-100-college-st-ft-13-floors/1355/9 "2025-08-12T11:26:58Z")

</div>

[https://www.newhavenindependent.org/article/101\_college\_st](https://www.newhavenindependent.org/article/101_college_st)
